My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Agency Name City of Everett <br /> Local Agency Address <br /> 2930 Wetmore . Local Agency Subcontractor List <br /> Prepared in compliance with RCW 39.30 060 as amended <br /> Everett,WA 98201. To Be Submitted with the Bid Proposal <br /> Project Name 2023 Pavement Maintenance Overlay <br /> Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the <br /> work of structural steel Installation,rebar Installation,heating,ventilation and air conditioning,plumbing,as described In <br /> Chapter 18.106 RCW,and electrical,as described In Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> the same work will result In your bid being non-responsive end therefore void, <br /> Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br /> rebar installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as <br /> described In Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name. <br /> To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is <br /> listed below to perform such work,the bidder certifies that the work will either(I)be performed by the bidder Itself,or(II)be <br /> performed by a lower tier subcontractor who will not contract directly with the bidder, <br /> Subcontractor Name G&G Inc. <br /> Work to be performed <br /> P EL.ECTRICAL ,. : . <br /> Subcontractor Name NO PLUMBING ON THIS PROJECT <br /> Work to be performed PLUMBING <br /> Subcontractor Name NO HVAC ON THIS PROJECT <br /> Work to be performed HVAC <br /> Subcontractor Name REECE CONSTRUCTION TO SELF PERFORM. <br /> Work to be performed RFBAR INSTALLATION <br /> Subcontractor Name NO.STRUCTURAL STEEL INSTALLATION ON THIS PROJECT <br /> Work to be performed STRUCTURAL STEEL INSTALLATION <br /> *Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes,etc,are considered <br /> electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical <br /> current Is connected during the project. <br /> DOT Form 271-015A <br /> Revised 06/2020 <br /> LOCAL AGENCY SUBCONTRACTOR LIST <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 88 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.