Laserfiche WebLink
CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this I aU\clay of Apa l` , 2023, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington (the "City") and <br /> Rt-gC <br /> a uoNSNkcy&mot— CoNt.cR,i\--tto 3 (the "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to complete in a workmanlike <br /> manner the work, improvements, and appurtenances in accordance with the Specifications and Plans <br /> and all other Contract Documents entitled: "2023 PAVEMENT MAINTENANCE OVERLAY" (the <br /> "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders <br /> C. Washington State Department of Transportation Standard Specifications 2023 as modified by all <br /> amendments thereto as of the date of bid opening of this Project ("Standard Specifications"). <br /> D. Contract Provisions, including without limitation the Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda (if any) <br /> G. Performance Bond and Payment Bond <br /> H. Contractor's Proposal/Bid (conformed copy dated 3- 1— oa.3 ) <br /> I. All provisions required by law whether set forth and reproduced herein or not. <br /> J. Disadvantaged Business Enterprise (DBE) utilization certification. <br /> 2. Contract Time. Substantial completion shall be achieved within 33 working days of the effective <br /> date of the Notice to Proceed. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br /> in the event that the Contractor does not complete the work in all respects and have it ready for use by <br /> the substantial completion date stated. Because it is difficult to accurately compute the amount of such <br /> costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages <br /> as stated in Section 1-08.9 of the Special Provisions, for each and every working day required to <br /> accomplish substantial completion of the work in excess of the period established above for substantial <br /> completion. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 98 <br />