Laserfiche WebLink
immunity under Title 51 RCW was the subject of mutual negotiation and was specifically entered into pursuant <br /> to the provisions of RCW 4.24.115. <br /> 9. Repair of Damage. The Contractor agrees to repair and replace all property of the City and all <br /> property of others damaged by it, its employees, subcontractors, suppliers and agents. <br /> 10. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under this contract <br /> is to be done at the Contractor's risk and that: (1) prior to submitting its proposal or bid, it became <br /> familiar with the conditions of excavation, subsurface, backfill, materials, climatic conditions, location, <br /> traffic, and other contingencies that may affect the work and has made its bid or proposal accordingly <br /> and (2) that it assumes the responsibility and risk of all loss or damage to materials or work that may <br /> arise from any cause whatsoever prior to completion. <br /> 11. Headings for Convenience Only. The headings in this document are for convenience only, and shall <br /> not be used or considered to interpret or construe this document. <br /> 12. Effective Date. This Contract is effective as of the date of the last person to sign it, and may be <br /> executed in multiple counterparts, each of which shall be deemed an original. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO03789 February 14,2023 100 <br />