My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM DESCRIPTION YES NO <br /> 42. Traffic Signs - Prior to approval of a Fabricator of Traffic Signs, <br /> the sources of the following materials must be submitted and <br /> approved for reflective sheeting, legend material, and <br /> aluminum <br /> sheeting. <br /> NOTE: *** Fabrication inspection required. Only signs tagged <br /> "Fabrication Approved" by WSDOT Sign Fabrication Inspector <br /> to be installed <br /> Custom Std <br /> Message Signing <br /> Message <br /> 43. Cutting & bending reinforcing steel <br /> 44. Guardrail components <br /> Custom Standard <br /> End Sec Sec <br /> 45. Aggregates/Concrete mixes Covered by <br /> WAC 296-127-018 <br /> 46. Asphalt Covered by <br /> WAC 296-127-018 <br /> 47. Fiber fabrics <br /> 48. Electrical wiring/components <br /> 49. treated or untreated timber pile <br /> 50. Girder pads (elastomeric bearing) <br /> 51. Standard Dimension lumbers. <br /> 52. Irrigation components <br /> Supplemental to Wage Rates 7 <br /> 03/03/2023 Edition, Published February 6, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.