My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS TO BIDDERS <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention <br /> of Gina Loring, (425) 257-7290 or gloring@everettwa.gov. <br /> 2.0 Bidder's Check List <br /> The bidder's attention is directed to the following City-provided forms which must be executed <br /> in full as required and submitted with the bid. Online fill-able forms may be downloaded from <br /> https://www.wsdot.wa.gov/forms/pdfForms.html, exact form number and revision date must <br /> be used: <br /> 1. Proposal: The lump sum and unit price items must be shown in the space <br /> provided. Show unit prices in figures. <br /> 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Local Agency Subcontractor List (DOT Form 271-15A Rev 06/2020): To be filled in <br /> by the Bidder. <br /> 4. Disadvantaged/Women's Business Enterprise Form: To be filled in and signed by <br /> the Bidder. <br /> 5. Local Agency Non-Collusion Declaration (DOT Form 272-0361 Rev 07/2011):To be <br /> submitted with the bid. <br /> 6. Bid Bond: This form provided by the City is to be executed by the Bidder and the <br /> surety company unless bid is accompanied by a certified check or cashier's check. <br /> The amount of this bond shall be not less than five percent (5%) of the total <br /> amount bid and may be shown in dollars or on a percentage basis. Cash will not <br /> be accepted. <br /> 7. Proposal for Incorporating Recycled Materials into the Project: To be filled in and <br /> signed by the Bidder. <br /> (http://www.wsdot.wa.gov/partners/apwa/recycledmatsbidform.pdf) <br /> Failure to complete the aforementioned forms and to submit said forms with the bid may be <br /> due cause for rejection of bid. <br /> 3.0 Pre-Award Forms <br /> The following form is required to be signed and submitted prior to award of Contract: <br /> 1. Certification of Compliance with Wage Payment Statutes: To be filled in and signed. <br /> This certification is not required to be submitted with the bid proposal and may be <br /> submitted after bid opening. The Contract cannot be awarded without this <br /> certification. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 xi <br />
The URL can be used to link to this page
Your browser does not support the video tag.