Laserfiche WebLink
TABLE OF CONTENTS FOR THE SPECIAL PROVISIONS <br /> PAGE <br /> INTRODUCTION 1 <br /> AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> SPECIAL PROVISIONS <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> DESCRIPTION OF WORK 1 <br /> DEFINITIONS 2 <br /> BID PROCEDURES AND CONDITIONS 4 <br /> 1-02.2 PLANS AND SPECIFICATIONS 4 <br /> PROPOSAL FORMS 4 <br /> PREPARATION OF PROPOSAL 5 <br /> RECYCLED MATERIALS PROPOSAL 5 <br /> BID DEPOSIT 6 <br /> WITHDRAWING, REVISING, OR SUPPLEMENTING PROPOSAL 6 <br /> IRREGULAR PROPOSALS 7 <br /> DISQUALIFICATION OF BIDDERS 8 <br /> PRE AWARD INFORMATION 8 <br /> AWARD AND EXECUTION OF CONTRACT 9 <br /> CONSIDERATION OF BIDS 9 <br /> IDENTICAL BID TOTALS 9 <br /> EXECUTION OF CONTRACT 9 <br /> CONTRACT BOND 10 <br /> JUDICIAL REVIEW 11 <br /> SCOPE OF WORK 11 <br /> COORDINATION OF CONTRACT DOCUMENTS, PLANS, SPECIAL PROVISIONS, 11 <br /> CONTROL OF WORK 11 <br /> REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK 11 <br /> FINAL INSPECTION 12 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 xiii <br />