My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 identified in the written notice, with Contracting Agency forces or by such other means as <br /> 2 the Contracting Agency may deem necessary. <br /> 3 <br /> 4 If the Contractor fails to comply with a written order to remedy what the Engineer <br /> 5 determines to be an emergency situation, the Engineer may have the defective and <br /> 6 unauthorized work corrected immediately, have the rejected work removed and replaced, <br /> 7 or have work the Contractor refuses to perform completed by using Contracting Agency <br /> 8 or other forces. An emergency situation is any situation when, in the opinion of the <br /> 9 Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk <br /> 10 of loss or damage to the public. <br /> 11 <br /> 12 Direct or indirect costs incurred by the Contracting Agency attributable to correcting and <br /> 13 remedying defective or unauthorized work, or work the Contractor failed or refused to <br /> 14 perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> 15 monies due, or to become due, the Contractor. Such direct and indirect costs shall <br /> 16 include in particular, but without limitation, compensation for additional professional <br /> 17 services required, and costs for repair and replacement of work of others destroyed or <br /> 18 damaged by correction, removal, or replacement of the Contractor's unauthorized work. <br /> 19 <br /> 20 No adjustment in contract time or compensation will be allowed because of the delay in <br /> 21 the performance of the work attributable to the exercise of the Contracting Agency's <br /> 22 rights provided by this Section. <br /> 23 <br /> 24 The rights exercised under the provisions of this section shall not diminish the <br /> 25 Contracting Agency's right to pursue any other avenue for additional remedy or damages <br /> 26 with respect to the Contractor's failure to perform the work as required. <br /> 27 <br /> 28 <br /> 29 1-05.11.RTF <br /> 30 1-05.11 Final Inspection <br /> 31 <br /> 32 Delete this section and replace it with the following: <br /> 33 <br /> 34 1-05.11 Final Inspections and Operational Testing <br /> 35 (October 1, 2005 APWA GSP) <br /> 36 <br /> 37 1-05.11(1) Substantial Completion Date <br /> 38 <br /> 39 When the Contractor considers the work to be substantially complete, the Contractor <br /> 40 shall so notify the Engineer and request the Engineer establish the Substantial <br /> 41 Completion Date. The Contractor's request shall list the specific items of work that <br /> 42 remain to be completed in order to reach physical completion. The Engineer will <br /> 43 schedule an inspection of the work with the Contractor to determine the status of <br /> 44 completion. The Engineer may also establish the Substantial Completion Date <br /> 45 unilaterally. <br /> 46 <br /> 47 If, after this inspection, the Engineer concurs with the Contractor that the work is <br /> 48 substantially complete and ready for its intended use, the Engineer, by written notice to <br /> 49 the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> 50 Engineer does not consider the work substantially complete and ready for its intended <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 12 <br />