My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-10.3.GR1 <br /> . ......... . .... ... <br /> 2 Traffic Control Labor, Procedures and Devices <br /> 3 <br /> 4 1-10.3(1).GR1 <br /> 5 Traffic Control Labor <br /> 6 <br /> 7 COE 1-10.3(1)C.RTF <br /> 8 COE 1-10.3(1)C.RTF <br /> 9 (City of Everett) <br /> 10 Section 1-10.3(1) is added as follows: <br /> 11 <br /> 12 1-10.3(1)C Uniformed Police Officer <br /> 13 (******) <br /> 14 <br /> 15 The Contractor shall provide commissioned uniformed police control at any time a <br /> 16 signalized intersection is dark or inoperative, such as during grinding or paving <br /> 17 operations where the traffic signal must be put into flashing operation. Signalized <br /> 18 intersections shall not be police controlled between the hours of 6:00am and 8:30am <br /> 19 nor 12:00pm to 7:30pm, unless directed by the Engineer. <br /> 20 <br /> 21 Coordination of commissioned uniformed Police control shall be coordinated with the <br /> 22 following personnel, listed in order of preference: <br /> 23 <br /> 24 1. City of Everett Police Officers Association <br /> 25 Post Office Box 1253 <br /> 26 Everett, WA 98201 <br /> 27 Contacts: <br /> 28 Officer Mike Bernardi (425) 327-9119 <br /> 29 Officer Mike Drake (425) 244-0025 <br /> 30 <br /> 31 2. Puget Sound Executive Services <br /> 32 625 B 5th Avenue, Suite 4 <br /> 33 Sequim, WA 98382 <br /> 34 Contact: <br /> 35 Nick Janssen (360) 681-7737 <br /> 36 <br /> 37 At the time of returning signals to normal operation, a city of Everett traffic signal <br /> 38 technician shall be present and on standby since most signals will not return to <br /> 39 normal operation with a turn of the police panel switch and require a conflict monitor <br /> 40 reset. <br /> 41 <br /> 42 Coordination of traffic signal technician shall be coordinated with the following <br /> 43 personnel: <br /> 44 <br /> 45 1. City of Everett Public Works <br /> 46 3200 Cedar Street <br /> 47 Everett, WA 98201 <br /> 48 Contact: <br /> 49 Steve Sawyer (425) 328-0643 <br /> 50 <br /> 51 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.