My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10312 EVERGREEN WAY GLINT CAR WASH 2023-07-31
>
Address Records
>
EVERGREEN WAY
>
10312
>
GLINT CAR WASH
>
10312 EVERGREEN WAY GLINT CAR WASH 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 10:58:09 AM
Creation date
5/3/2023 2:09:23 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10312
Tenant Name
GLINT CAR WASH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P U B L I OIV O R KS PERMIT • DateApplied: 4/5/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2104-011 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETTEverett, WA 98201 Planning Reference#: BSP20-005 <br /> WASHINGTON 425-257-8810 Public Works Fee: $41,188.23 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> S R KLEIN FISH-ON INVESTMENTS LLC PEDRO DEGUZMAN <br /> PO BOX 3830 <br /> EVERETT,WA,98213 <br /> PHONE: PHONE:2067959023 <br /> TAX PARCEL ID#:00535200001001 SITE ADDRESS: 10312 EVERGREEN WAY MULTIPARCE <br /> DESCRIPTION:SITE IMPROVEMENTS FOR COMMERCIAL BSP <br /> ASSOCIATED WITH DEVELOPMENT OF A NEW CAR WASH, DRIVE-THRU RESTAURANT,AND COFFEE DRIVE THRU. SEPARATE PW PERMIT <br /> FOR SIGNAL,STREET LIGHTING&TRAFFIC LOOPS. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 09/20/2021.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9.On-site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded document submitted to the City prior to final <br /> approval/close out of the permit. <br /> 10. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 11.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.To schedule a planning <br /> inspection,contact Planning@everettwa.gov and request an inspection with the permit number,site address,and inspection type listed. <br /> Please allow up to one week for the inspection to be scheduled. <br /> 13. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 14.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Request h all i ms have been completed for <br /> this permit. n n <br /> v � � <br /> Continued on back... SEP 2 9 2021 j <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.