My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD Geotech Report 2023-05-04
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
Geotech Report
>
3800 RIVERFRONT BLVD Geotech Report 2023-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2023 8:10:16 AM
Creation date
5/4/2023 7:16:17 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> HWAGEOSCIENCES INC. REVIEWED FOR PERMIT <br /> LAM1 <br /> August 16 2019 S V <br /> S\-q <br /> HWA Project No. 2015-061-21 Task 600-7 Q ' 2l <br /> Shelter Holdings (,t� 0ti Seri <br /> eck'' `�e <br /> 11624 SE 5th Street, Suite 210 <br /> Bellevue, Washington 98005 <br /> Attention: Mr. Eric Evans <br /> SUBJECT: ADDENDUM 3 TO GEOTECHNICAL ENGINEERING REPORTS <br /> RIVERFRONT BOULEVARD & RIVERFRONT DEVELOPMENT, PHASE I <br /> EVERETT, WASHINGTON <br /> Dear Mr. Evans: <br /> We respectfully submit this Addendum letter for Everett Riverfront Project in Everett, <br /> Washington. All recommendations stated in our original reports and addendums, listed below, <br /> remain valid unless superseded by this addendum report. Our previous reports are: <br /> • "Geotechnical Engineering Report, Riverfront Boulevard, Everett, Washington" dated <br /> March 26, 2019, <br /> • "Geotechnical Engineering Report, Riverfront Development Phase I, Everett, <br /> Washington"dated March 19, 2019, <br /> • "Addendum 1 to Geotechnical Engineering Report's, Everett Riverfront Development, <br /> and Riverfront Boulevard" Dated May 13, 2019." <br /> • "Addendum 2 to Geotechnical Engineering Report's (Revised), Everett Riverfront <br /> Development, and Riverfront Boulevard"Dated July 19, 2019." <br /> The purpose of this addendum is to provide geotechnical recommendations, associated with the <br /> Riverfront Boulevard and Phase I Development design, that are not included in previous reports <br /> or addendums. <br /> Utility Vaults and Manholes <br /> When the bases of non-pile supported utility vaults or manholes extend into <br /> refuse materials HWA recommends that these structures be placed on a crushed 21 1' 30th Drive SF <br /> Suite II() <br /> rock structural fill layer at least 12 inches thick . This fill should be compacted liuthell.WA 98u21. ulu <br /> '1e1: 425.774.0106 <br /> Fax: 4 2 5.774.2714 <br /> www.hwageo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.