My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2856
>
Ordinances
>
Ordinance 2856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2023 3:04:01 PM
Creation date
5/5/2023 3:03:39 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2856
Date
4/16/1940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> ORDINANCE No. <br /> 856. <br /> AN ORDINANCE providing for an emergency expenditure <br /> to increase the storage capacity of the Lake bhaplain Reservoir <br /> by construction of dike and other incidental work, and to <br /> construct an additional pipe line from the Sultan xiver diversion <br /> dam to Portal No. 1 of the tunnel leading to Lake Chaplain; <br /> constructing necessary rock rip rap along river to protect said <br /> pipe line , and providing f.Az' the installation of a high service <br /> water storage tank in the Alderwood District , the estimated cost <br /> of said work being in the sum of055,000.00 , and declaring an <br /> emergency. <br /> WHEREAS, It is necessary to increase the storage <br /> capacity of the Lake Chaplain reservoir by construction of dikes <br /> and other incidental work due to the increase demand for water <br /> by the pulp mills; and <br /> WHEREAS, it is necessary to increase the flow from <br /> the Sultan River Diversion Dam to said Lake Chaplain Reservoir <br /> by constructing an additional pipe line from said diversion <br /> dam to Portal No.1 of tunnel leading to Lake Chaplain and <br /> constructing necessary rock rip rap along river to protect said <br /> pipe line ; and <br /> WIRES, this work is a portion of a VPA project in <br /> which the Water Department is assuming sponsorship for certain <br /> materials to be used in this construction; and <br /> WHEREAS, it has become necessary due to increased water <br /> consumption in the Alderwood District to install a new high <br /> service water storage tank; and <br /> WHEREAS, the 1940 water department budget did not <br /> anticipate these expenditures, and it is urgent that this work <br /> be carried out with minimum delay due to above mentioned increased <br /> demand for water. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That a public emergency exists and the <br /> expenditures therefor could not have been reasonably foreseen <br /> at the time of making of the budget for the year 1940, to-wit: <br /> October 1939; that said emergency exists by reason of the fact <br /> that it is necessary to increase the storage capacity of the <br /> Lake Chaplain Reservoir by construction of dikes and other <br /> incidental work due to the increased demand for water by the <br /> pulp mills, and it is necessary to increase the flow from the <br /> Sultan river diversion dam to said Lake Cbaplain Reservoir by <br /> constructing an additional pipe line from said diversion dam <br /> to Portal No.lof tunnel leading to Lake Chaplain and con- <br /> structing necessary rock rip rap along river to protect pipe <br /> line , said work to be done in connection with the. WPA project ; <br /> that the estimated cost of said work and material is the sum <br /> of Fifty Thousand Dollars ($50,000.00) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.