My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1322 RUCKER AVE 2023-05-11
>
Address Records
>
RUCKER AVE
>
1322
>
1322 RUCKER AVE 2023-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 10:45:43 AM
Creation date
5/8/2023 1:23:10 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1322
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2205-039 Description: Bathroom Remodel <br /> Applied:5/24/2022 Approved: 5/24/2022 Site Address: 1322 RUCKER AVE <br /> Issued:5/25/2022 Finaled: 12/20/2022 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant:SEATOWN ELECTRIC HEATING&AIR <br /> Parent Permit: B2107-065 Owner: MCLEAN GARY S&ARDIS M <br /> Parent Project: Contractor:SEATOWN ELECTRIC HEATING&AIR <br /> Details: <br /> Shower,Toilet,Sink,Laundry and Hose Bibb <br /> Bathroom Remodel <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> *NO INSPECTION <br /> CURRENTLY Permit Technician eTRAKiT Inspection Request <br /> SELECTED* <br /> Notes: <br /> 12/18/2022 3:14 PM Gary McLean <br /> Final plumbing <br /> Contact Name:Gary McLean <br /> Site Address:1322 RUCKER AVE <br /> Phone:4257658578 <br /> e-Mail:gary_mclean@msn.com <br /> 6/29/2022 6/29/2022 PLUMB 03-ROUGH BILLY APPLETON CORRECTION eTRAKiT Inspection Request <br /> IN REQUIRED <br /> Notes: <br /> 6/17/2022 7:02 AM SEATOWN ELECTRIC HEATING&AIR <br /> Contact Name:Gary Mclean <br /> Site Address:1322 RUCKER AVE <br /> Phone:4257658578 <br /> e-Mail:gary_mclean@msn.com <br /> (6/29/2022 1:31 PM BGA) <br /> bga changed Inspection Type from PLUMB 08-FINAL to PLUMB 03-ROUGH IN <br /> (6/29/2022 1:36 PM BGA) <br /> 1.Horizontal to horizontal changes of direction must be made with fittings of an approved sweep. <br /> 2.Shower has no vent,not a legal horizontal wet vent. <br /> 3.No 3"upper terminal cleanout. <br /> I <br /> Printed:Tuesday,20 December, 2022 1 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.