My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 81ST PL SE 2023-06-20
>
Address Records
>
81ST PL SE
>
2602
>
2602 81ST PL SE 2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:42:04 AM
Creation date
5/9/2023 9:21:07 AM
Metadata
Fields
Template:
Address Document
Street Name
81ST PL SE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas on the site that have potential erosion problems: <br /> Steep ravine south of property <br /> Locations where surface water leaves the site: <br /> street storm drain <br /> Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br /> All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br /> during construction.Each of the 13 requirements below contains a list of Best Management Practices (BMPs) <br /> that are accepted by the Washington State Department of Ecology(Ecology)for satisfying each requirement. <br /> The BMPs below are the most common. For a complete selection of BMPs please see Volume II of Ecology's <br /> Stormwater Management Manual for Western Washington. <br /> Each of the 13 Elements below must be considered in the SWPPP. Select all <br /> BMPs that you will be using to satisfy each requirement.All requirements must <br /> 0 have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> 0 BMP C101: Preserving Natural Vegetation <br /> ❑ BMP C102: Buffer Zones <br /> ❑ BMP C103: High Visibility Plastic or Metal Fence <br /> ❑ Other Per the SWMMWW: <br /> ------------------ <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------ <br /> Element 2. Establish construction: <br /> 0 BMP C105:Stabilized Construction Entrance/Exit <br /> ❑ BMP C106:Wheel Wash <br /> ❑ BMP C107: Construction Road/Parking Area Stabilization <br /> ❑ Other Per the SWMMWW: <br /> ------------------ <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------ <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.