My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 81ST PL SE 2023-06-20
>
Address Records
>
81ST PL SE
>
2602
>
2602 81ST PL SE 2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:42:04 AM
Creation date
5/9/2023 9:21:07 AM
Metadata
Fields
Template:
Address Document
Street Name
81ST PL SE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOURCES: Portion of total amendment quantity(from line 11)that is: <br /> 12. Purchased from off-site sources ..................................................................... ---_____% <br /> 13. Stockpiled soil and duff from on-site ................................................................ ---_____% <br /> 14. Chipped and stockpiled woody material from on-site ........................................... % <br /> 15. Imported topsoil .......................................................................................... --------% <br /> 16. CHECK:The total of lines 12 through 15 should total 100% ................................... 100% <br /> PLANTING BEDS <br /> 17. Area of landscaping and planting beds (from line 4 above) .................................... -----------ft2 <br /> a. Multiply by conversion factor from 3 inches to cubic yards (yd'): x 0.0093 <br /> 18. MULCH QUANTITY NEEDED ............................................................................. -------------yd <br /> SOURCES: Portion of total mulch quantity(from line 18)that is: <br /> 19. Purchased from off-site sources............................................................................ ----------% <br /> 20. Chipped and stockpiled woody material from on-site .............................................. _---------% <br /> 21. CHECK:The total of lines 19 and 20 should total 100% ......................................... 100% <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.