My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10521 19TH AVE SE ALLIED TELESIS INC 2023-07-03
>
Address Records
>
19TH AVE SE
>
10521
>
ALLIED TELESIS INC
>
10521 19TH AVE SE ALLIED TELESIS INC 2023-07-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2023 9:22:37 AM
Creation date
5/10/2023 9:10:05 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10521
Tenant Name
ALLIED TELESIS INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2302-047 <br />Applied: 2/24/2023 <br />Issued: 2/27/2023 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:2/27/2023 <br />Finaled: 5/9/2023 <br />Description: Tenant improvement of existing office space. Interior only. <br />Site Address: 10521 19TH AVE SE <br />City, State Zip Code: EVERETT, WA 98208 <br />Applicant: AMERICAN MECHANICAL CORP - PLUM <br />Owner: ALLIED TELESIS INC <br />Contractor: AMERICAN MECHANICAL CORP - PLUM <br />Details: <br />Tenant Name = Allied Telesis. Rough-in/Install restroom & breakroom fixtures. <br />SCHEDULED DATE COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />3/20/2023 3/20/2023 <br />PLUMB 03-ROUGH <br />JASON <br />PARTIAL <br />see notes <br />IN <br />MORRISSEY <br />APPROVAL <br />Notes: <br />3/16/2023 2:14 PM Jordan Mach <br />Contact Name: Jordan Mach <br />Site Address: 10521 19TH AVE SE <br />Phone:2065016810 <br />e-Mail: Jmach1427@gmail.com <br />- Walls ok, DWV and water piping. 2nd floor bathrooms and break room sink. <br />3/20/2023 <br />3/20/2023 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- Install floor drains in both bathrooms on 2nd floor per the UPC. Finish running <br />2" common vent <br />through roof. <br />4/14/2023 <br />4/14/2023 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />4/13/2023 2:25 PM Jordan Mach <br />1st floor ceiling inspection. 2nd floor wall/ceiling signed off previously. <br />Contact Name: Jordan Mach <br />Site Address: 10521 19TH AVE SE <br />Phone:2065016810 <br />e-Mail: Jmach1427@gmail.com <br />- Rough DWV, trap primers, and water distribution piping. <br />I <br />Printed: Tuesday, 09 May, 2023 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.