My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/05/10 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/05/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 10:17:28 AM
Creation date
5/16/2023 8:59:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC <br />1+1 �I RESTROOM <br />COMPANY <br />Building Better Places To Go.SM <br />which we have designed and fabricated, are part of the project, PRC supplies the manufacturing centers <br />with these proprietary PRC components. We then schedule the in -plant construction process to <br />coordinate with your delivery date through our Operations Division field staff. We guaranty on time at <br />cost delivery weather permitting. <br />Special Payment and Progress Billing Terms: <br />Invoicing begins on the 30th of the month following an order and/or the acceptance of the proposal/contract. <br />The first progress billing invoice will be issued for the commencement of design and engineering of <br />architectural plans. This will be 10% of the contracted amount. Once construction begins invoicing will <br />commence monthly based on plant percentage of completion, supported by photographs. <br />In the event of project stoppage, additional fees may be assessed for re -mobilization, storage, crane <br />costs, etc. Our discounted project costs are based upon timely payments. Delays in payment could <br />change delivery schedules and project costs. <br />Delivery and Installation: <br />Site Inspection: <br />PRC staff, upon site arrival, will verify the required dimensions of the building pad and the corner <br />locations/elevation. We will also verify the delivery path from an accessible road or street and install the <br />underground utilities to the point of connection nominally 6' from the exterior of the building. <br />Installation: <br />PRC will install the building turn -key, except for any exclusion (listed under "Exclusions," herein.) <br />Installation of Utilities under the Prefabricated Building: <br />We fabricate off -site an underground utilities (water, and DWV piping and fittings) preassembled <br />plumbing and electrical tree. Our site staff will set the underground tree into code depth excavated <br />trenches and our staff will install the coarse concrete sand to bed the piping per our submitted drawing. <br />We provide all the buildings under -slab piping including the driven electrical ground rod. The <br />Owner/General Contractor brings utility services to within 6' of the pad and are responsible for final <br />connections at that point. <br />Connection of Utilities Post Building Placement: <br />After placement of the building on the pad by PRC, our field staff will tie in the water and sewer <br />connection "inside" the building only and terminate at a point of connection (POC) outside the building <br />clearly marked for each utility service. The Owner/General Contractor is responsible for final utility point <br />of service connections at the nominal 6' from building locations. <br />Electrical: <br />PRC provides the electrical conduit to the POC 6' from the building. The Owner/General Contractor pulls <br />the wire and ties it off on the electrical panel. <br />EMB Public Restroom - City of Everett, WAI 4/10/20231 Reference # 11543A-4/2/2023-4 <br />2587 Business Parkway I Minden, NV 89423 I www.PublicRestroomCompany.com I p: 888-888-2060 I f: 888-888-1448 <br />4of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.