Laserfiche WebLink
PUBLIC <br />t <br />I RESTROOM <br />COMPANY <br />Building Better Places To Go.' <br />5. Not responsible for removing any soil, sand, or other debris as a result of trenching or <br />installation. <br />6. Survey, location of building corners, finish floor elevation, excavation, and construction of <br />subgrade building pad and footings (if required) per PRC plans. <br />7. Soil conditions not suitable for bearing a minimum of 1500 PSF with compaction to 90% <br />maximum dry density shall require Owner/General Contractor correction before building <br />placement. If no soils testing report is available before bid, Owner/General Contractor <br />must verify site supporting soils at a minimum of 1500 PSF because that is the least we <br />can place our structures on or Owner/General Contractor or engineer of record must <br />design a foundation system to meet the imposed loads of site placement. <br />8. Improper water pressure, an undersized meter, or improper water volume flow to the <br />building may necessitate a change order for installation of a building internal diaphragm <br />tank to provide the minimum flow rate and static pressure of up to 60 PSI and a minimum <br />of 40 PSI to properly flush the fixtures. Building water service chlorination, post <br />installation, shall be by Owner/General Contractor. <br />9. Our bid included crane costs are based on a maximum 35' radius from the center pin of <br />the crane (10' back from the rear of the crane) to the building center point of the furthest <br />building module roof. If additional distance requires a larger crane, additional costs will be <br />assessed by change order to the Owner/General Contractor. <br />10. Bonds, building permits, a site survey, special inspection fees, minor trash removal <br />(nominally one pickup truck of shipping materials), final utility connections to the on -site <br />water, sewer and electrical are by the Owner/General Contractor. Since the building is <br />fully inspected and tested in plant, minor plumbing leaks (if water is not available when <br />building site work installation is completed) is by the Owner/ General Contractor. <br />11. Site Traffic Control, if applicable, shall be by Owner/ General Contractor, not PRC. <br />12. Any equipment installation, site work or special inspections other than described within <br />this proposal, shall be by Owner/General Contractor. <br />13. Backflow certification if applicable by Owner/ General Contractor. <br />Insurance and Prevailing Wage Certification: <br />PRC shall comply with the required insurance requirements, wage reports, and safety requirements for <br />the project, including OSHA regulations. <br />Special Insurance to protect the Building before acceptance: <br />As PRC requires payment for each month of off -site construction, and since the building is not on owner <br />property where their insurance will cover the building, we maintain a special policy that insures the <br />property even when paid for off -site until the building is finally accepted by the owner. This special <br />policy protects the Owner's custom ordered materials to be used in the fabrication of the building <br />during this period. PRC provides this Stock Throughput Policy to cover the building materials from <br />supplier to manufacturer, while it is being built off -site, while in transit to the job site, during and after it <br />is installed on -site until final acceptance. This special policy has a $1,000,000 coverage limit. This <br />exceeds the cost of any single building we have offered for sale herein. <br />EMB Public Restroom - City of Everett, WA' 4/10/20231 Reference # 11543A-4/2/2023-4 <br />2587 Business Parkway I Minden, NV 89423 I www.PublicRestroomCompany.com I p: 888-888-2060 I f: 888-888-1448 <br />6 of 8 <br />