My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2808 EVERETT AVE 2023-05-19
>
Address Records
>
EVERETT AVE
>
2808
>
2808 EVERETT AVE 2023-05-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 9:11:44 AM
Creation date
5/19/2023 9:11:37 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2808
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1110 <br /> Intake &Approval Sheet (FOR PERMIT STAFF ONLY) • PERMIT# 9, l DO 2 <br /> BUILDING PLANNING <br /> • <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> • <br /> ❑ Route to Commercial Building ❑Attach to Project No. <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a"W"Permit ❑ OK to Route to Other Departments <br /> Bldg/TI/Addn/Rem Size ❑ Hold in Planning File Drawer <br /> Garage/Accessory Struct.Size Zone <br /> Number of Stories Overlay/Agreement <br /> Basement El No ❑Yes, Fin/Unfin Nonresidential Use <br /> Type of Construction Residential Use <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupancy Load Total No.of Dwelling Units: <br /> Fire Sprinklers: ❑Update Existing ❑New System ONot Req'd Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Reason Sprinklers Required: "In Lieu"Fee:Type: Amount$ <br /> Fire Alarm: El Update Existing El New System ❑Not Req'd School Impact Fee: Total $ - <br /> Reason Fire Alarm Required: Calculated: Credit: <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No ❑Everett School Dist ❑Mukilteo School Dist <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No Additional Notes: <br /> VALUATION CALCULATION: Total$ <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Intake OK by: . Date: <br /> Additional Notes: Intake Comments: IPW Worksheet Needed if: <br /> =OSys Dev Eval ❑Traf o Mit Eval <br /> =DSite Work or Drainage Proposed <br /> Approved By: Date: _OBacicflow Prevention for high hazard: <br /> • :(dental,medical,animals,mortuary,hospital, <br /> !supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end -- PW Review Worksheet ,.,.,.,.,..., <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: ❑This Permit is Approved by Public Works <br /> ❑See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: ❑A Separate PW Permit is Required(Permit#:PW <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE ❑ Is in a Separate Green Folder(loin with this folder for permit Issuance) <br /> 0 Review/Inspection Scope-ADD FIRE FEE ❑Will be issued separately(Separate Green Folder,PW Issued ahead of Bldg) <br /> Approved By:K IArau S r Date: 1-1 22, ❑ Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.