Laserfiche WebLink
I <br /> TABLE OF CONTENTS FOR THE SPECIAL PROVISIONS <br /> IPAGE <br /> INTRODUCTION 1 <br /> AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> I <br /> SPECIAL PROVISIONS <br /> I DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> DESCRIPTION OF WORK 1 <br /> IDEFINITIONS 2 <br /> BID PROCEDURES AND CONDITIONS 4 <br /> I1-02.2 PLANS AND SPECIFICATIONS 4 <br /> PREPARATION OF PROPOSAL 4 <br /> 1 PREPARATION OF PROPOSAL 4 <br /> PREPARATION OF PROPOSAL 5 <br /> IRECYCLED MATERIALS PROPOSAL 6 <br /> DELIVERY OF PROPOSAL 6 <br /> I WITHDRAWING, REVISING, OR SUPPLEMENTING PROPOSAL 7 <br /> IRREGULAR PROPOSALS 8 <br /> DISQUALIFICATION OF BIDDERS 9 <br /> IPRE AWARD INFORMATION 10 <br /> IDENTICAL BID TOTALS 10 <br /> IEXECUTION OF CONTRACT 10 <br /> CONTRACT BOND 11 <br /> IJUDICIAL REVIEW 12 <br /> COORDINATION OF CONTRACT DOCUMENTS, PLANS, SPECIAL PROVISIONS, 12 <br /> IFINAL INSPECTION 13 <br /> SUPERINTENDENTS, LABOR AND EQUIPMENT OF CONTRACTOR 14 <br /> I COOPERATION WITH OTHER CONTRACTORS 14 <br /> OTHER CONTRACTS OR OTHER WORK 15 <br /> CONTROL OF MATERIAL 15 <br /> I <br /> BUILD AMERICA/BUY AMERICA 15 <br /> RECYCLED MATERIALS 18 <br /> ILEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 18 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 13 <br />