Laserfiche WebLink
Note: Unit prices for all items,all extensions, and the total amount bid must be shown. Where conflict occurs <br /> between the unit price and the total amount named for any item,the unit price shall prevail, and totals shall be <br /> corrected to conform thereto. All entries must be typed or entered in ink. I <br /> BID SCHEDULE <br /> I <br /> BIDDER: HM Pacific Northwest, Inc. <br /> Item I <br /> ITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT <br /> No. Qty <br /> Broadway(41st St to Hewitt Ave) I <br /> 1 Mobilization LS 1 $ 88,000.00 $ 88,000.00 <br /> 2 Traffic Control Supervisor LS 1 $ 28,750.00 $ 28,750.00 <br /> 3 Flaggers (Minimum Bid Prevailing Wage) HR 2,150 $ 61.50 $ 132,225.00 1 <br /> 4 Contractor Provided Uniformed Police Officer HR 600 $ 117.50 $ 70,500.00 <br /> 5 Other Traffic Control Labor HR 66 $ 72.50 $ 4,785.00 I <br /> 6 Construction Signs Class A SF 80 $ 21.00 $ 1,680.00 <br /> 7 Sequential Arrow Sign HR 210 $ 5.70 $ 1,197.00 <br /> 8 Portable Changeable Message Sign HR 350 $ 8.10 $ 2,835.00 1 <br /> 9 Other Temporary Traffic Control Devices LS 1 $ 17,700.00 $ 17,700.00 <br /> 10 Planing Bituminous Pavement SY 41,789 $ 3.20 $ 133,724.80 i <br /> 11 Additional Planing Bituminous Pavement SY 6,268 $ 1.20 $ 7,521.60 111 <br /> 12 HMA Class '/2 Inch PG 64-22 TON 5,120 $ 121.25 $ 620,800.00 <br /> 13 Street Cleaning HR 60 $ 187.00 $ 11,220.00 II <br /> 14 Adjust Manhole EA 13 $ 190.00 $ 2,470.00 <br /> 111 <br /> 15 Adjust Catch Basin/Inlet to Grade EA 18 $ 95.00 $ 1,710.00 <br /> 16 Adjust Water Valve Box to Grade EA 20 $ 190.00 $ 3,800.00 1 <br /> 17 Adjust Existing Monument Castings to Grade EA 12 $ 190.00 $ 2,280.00 <br /> 18 Plastic Wide Line LF 1,777 $ 7.15 $ 12,705.55 I <br /> 19 Plastic Traffic Arrow EA 48 $ 275.00 $ 13,200.00 I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011 ) I <br /> WO#3788 March 2,2023 114 <br /> I <br />