Laserfiche WebLink
I <br /> I Local Agency Name <br /> Local Agency Address <br /> City of Everett Local Agency Subcontractor List <br /> I <br /> 2930 Wetmore <br /> Everett,WA Prepared in compliance with RCW 39.30.060 as amended <br /> To Be Submitted with the Bid Proposal <br /> Project Name _2023_Federal._Overlay <br /> I Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the <br /> work of structural steel Installation,rebar installation,heating,ventilation and air conditioning,plumbing,as described in <br /> Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> I the same work will result in your bid being non-responsive and therefore void. <br /> Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br /> rebar Installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as <br /> described in Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name. <br /> I To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is <br /> listed below to perform such work,the bidder certifies that the work will either(I)be performed by the bidder itself,or(ii)be <br /> performed by a lower tier subcontractor who will not contract directly with the bidder. <br /> I Subcontractor Name C7 G , 1 c ••— !>3�4k S E 22�} ` St k en b , t.J A q$o4-z <br /> Work to be performed <br /> Pi t l Elee -t ec,.Q_ war K <br /> I <br /> I Subcontractor Name <br /> Work to be performed <br /> I <br /> Subcontractor Name <br /> IWork to be performed <br /> I <br /> Subcontractor Name <br /> I <br /> Work to be performed <br /> ISubcontractor Name <br /> Work to be performed <br /> I <br /> I 'Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes,etc,are considered <br /> electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical <br /> current is connected during the project. <br /> I DOT Form 271-015A <br /> Revised 06i2020 <br /> ILOCAL AGENCY SUBCONTRACTOR LIST <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID1t STBGUL-2715(011) <br /> WOU3788 March 2,2023 117 <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />