My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I Local Agency Name <br /> Local Agency Address <br /> City of Everett Local Agency Subcontractor List <br /> I <br /> 2930 Wetmore <br /> Everett,WA Prepared in compliance with RCW 39.30.060 as amended <br /> To Be Submitted with the Bid Proposal <br /> Project Name _2023_Federal._Overlay <br /> I Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the <br /> work of structural steel Installation,rebar installation,heating,ventilation and air conditioning,plumbing,as described in <br /> Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> I the same work will result in your bid being non-responsive and therefore void. <br /> Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br /> rebar Installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as <br /> described in Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name. <br /> I To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is <br /> listed below to perform such work,the bidder certifies that the work will either(I)be performed by the bidder itself,or(ii)be <br /> performed by a lower tier subcontractor who will not contract directly with the bidder. <br /> I Subcontractor Name C7 G , 1 c ••— !>3�4k S E 22�} ` St k en b , t.J A q$o4-z <br /> Work to be performed <br /> Pi t l Elee -t ec,.Q_ war K <br /> I <br /> I Subcontractor Name <br /> Work to be performed <br /> I <br /> Subcontractor Name <br /> IWork to be performed <br /> I <br /> Subcontractor Name <br /> I <br /> Work to be performed <br /> ISubcontractor Name <br /> Work to be performed <br /> I <br /> I 'Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes,etc,are considered <br /> electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical <br /> current is connected during the project. <br /> I DOT Form 271-015A <br /> Revised 06i2020 <br /> ILOCAL AGENCY SUBCONTRACTOR LIST <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID1t STBGUL-2715(011) <br /> WOU3788 March 2,2023 117 <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.