Laserfiche WebLink
' PAYMENTS 61 <br /> RETAINAGE 63 <br /> TIME LIMITATION AND JURISDICTION 63 <br /> TEMPORARY TRAFFIC CONTROL 64 <br /> TRAFFIC CONTROL MANAGEMENT 64 <br /> TRAFFIC CONTROL LABOR, PROCEDURES AND DEVICES 65 <br /> TRAFFIC CONTROL LABOR 65 <br /> 1-10.3(1)C UNIFORMED POLICE OFFICER 65 <br /> MEASUREMENT 66 <br /> DIVISION 2 <br /> EARTHWORK <br /> STREET CLEANING 68 <br /> DIVISION 5 <br /> SURFACE TREATMENTS AND PAVEMENTS <br /> HOT MIX ASPHALT 70 <br /> ASPHALT COST PRICE ADJUSTMENT 94 <br /> DIVISION 7 <br /> DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS 96 <br /> 1 CONSTRUCTION REQUIREMENTS 96 <br /> ADJUSTING MANHOLES AND CATCH BASINS TO GRADE 96 <br /> ' ADJUSTING VALVE BOXES TO GRADE 97 <br /> 7-05.4 MEASUREMENT 97 <br /> 7-05.5 PAYMENT 98 <br /> ' DIVISION 8 <br /> MISCELLANEOUS CONSTRUCTION <br /> ' RAISED PAVEMENT MARKERS 99 <br /> MONUMENT CASES 100 <br /> 8-13.1 DESCRIPTION 100 <br /> 8-13.2 VACANT 100 <br /> 8-13.3 CONSTRUCTION REQUIREMENTS 100 <br /> 8-13.4 MEASUREMENT 100 <br /> 8-13.5 PAYMENT 100 <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 15 <br />