Laserfiche WebLink
I <br /> IPROPOSAL FOR INCORPORATING RECYCLED MATERIALS INTO THE PROJECT <br /> I <br /> s APWA-WA Division 1 Committee rev.1/8/2016 <br /> IProposal for Incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1,2016(SHB1695),the Bidder shall <br /> propose below,the total percent of construction aggregate and concrete materials to be <br /> I incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E,Table on Maximum Allowable Percent(By Weight) <br /> of Recycled Material,of the Standard Specifications. <br /> I Proposed total percentage: 2 0 °70 percent. <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> not constitute a Bidder Preference,and will not affect the determination of award, unless two or <br /> I more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> percentages will be used as a tie-breaker,per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br /> I1-06.6 of the Special Provisions. <br /> Bidder: HM Pacific west,Inc. <br /> I Signature of Authorized Official: - <br /> Date: 4/4/2 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 135 <br /> irovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />