My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT,WASHINGTON <br /> t <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this a 6.,tn day of pizi _ , 2023, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington (the "City") and <br /> ism PtctnG <br /> a INP+_S.)-11 7otJ Cc:.Nikis.--riaK) (the "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor,tools,materials, equipment, and supplies required to complete in a workmanlike manner <br /> the work, improvements, and appurtenances in accordance with the Specifications and Plans and all <br /> other Contract Documents entitled: "2023 FEDERAL OVERLAY"(the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders <br /> C. Washington State Department of Transportation Standard Specifications 2023 as modified by all <br /> amendments thereto as of the date of bid opening of this Project ("Standard Specifications"). <br /> D. Contract Provisions, including without limitation the Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda(if any) <br /> G. Perfounance Bond and Payment Bond <br /> H. Contractor's Proposal/Bid (confoinied copy dated - . oxi ) <br /> I. All provisions required by law whether set forth and reproduced herein or not. <br /> J. Disadvantaged Business Enterprise (DBE) utilization certification. <br /> 2. Contract Time. Substantial completion shall be achieved within 33 working days of the <br /> effective date of the Notice to Proceed. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> expense in the event that the Contractor does not complete the work in all respects and have <br /> it ready for use by the substantial completion date stated. Because it is difficult to accurately <br /> compute the amount of such costs and damages, the Contractor hereby covenants and agrees <br /> to pay to the City liquidated damages as stated in Section 1-08.9 of the Special Provisions, for <br /> each and every working day required to accomplish substantial completion of the work in <br /> excess of the period established above for substantial completion. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.