Laserfiche WebLink
I <br /> CITY OF EVERETT,WASHINGTON <br /> t <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this a 6.,tn day of pizi _ , 2023, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington (the "City") and <br /> ism PtctnG <br /> a INP+_S.)-11 7otJ Cc:.Nikis.--riaK) (the "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor,tools,materials, equipment, and supplies required to complete in a workmanlike manner <br /> the work, improvements, and appurtenances in accordance with the Specifications and Plans and all <br /> other Contract Documents entitled: "2023 FEDERAL OVERLAY"(the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders <br /> C. Washington State Department of Transportation Standard Specifications 2023 as modified by all <br /> amendments thereto as of the date of bid opening of this Project ("Standard Specifications"). <br /> D. Contract Provisions, including without limitation the Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda(if any) <br /> G. Perfounance Bond and Payment Bond <br /> H. Contractor's Proposal/Bid (confoinied copy dated - . oxi ) <br /> I. All provisions required by law whether set forth and reproduced herein or not. <br /> J. Disadvantaged Business Enterprise (DBE) utilization certification. <br /> 2. Contract Time. Substantial completion shall be achieved within 33 working days of the <br /> effective date of the Notice to Proceed. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> expense in the event that the Contractor does not complete the work in all respects and have <br /> it ready for use by the substantial completion date stated. Because it is difficult to accurately <br /> compute the amount of such costs and damages, the Contractor hereby covenants and agrees <br /> to pay to the City liquidated damages as stated in Section 1-08.9 of the Special Provisions, for <br /> each and every working day required to accomplish substantial completion of the work in <br /> excess of the period established above for substantial completion. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 137 <br />