My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> ITEM DESCRIPTION YES NO <br /> 27. Precast Railroad Crossings - Concrete CrossingStructure <br /> 9 X <br /> Slabs. <br /> 28. 12, 18 and 26 inch Standard Precast Prestressed Girder— <br /> Standard Precast Prestressed Girder for use in structures. <br /> Fabricator plant has annual approval of methods and materials <br /> to <br /> be used. Shop Drawing to be provided for approval prior to X <br /> casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 29. Prestressed Concrete Girder Series 4-14 - Prestressed Concrete <br /> Girders for use in structures. Fabricator plant has annual <br /> approval <br /> of methods and materials to be used. Shop Drawing to be X <br /> provided for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 30. Prestressed Tri-Beam Girder- Prestressed Tri-Beam Girders for <br /> use in structures. Fabricator plant has annual approval of <br /> methods and materials to be used. Shop Drawing to be <br /> provided <br /> for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 31. Prestressed Precast Hollow-Core Slab — Precast Prestressed <br /> Hollow-core slab for use in structures. Fabricator plant has <br /> annual <br /> approval of methods and materials to be used. Shop Drawing to <br /> be provided for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A. <br /> 32. Prestressed-Bulb Tee Girder- Bulb Tee Prestressed Girder for <br /> use in structures. Fabricator plant has annual approval of <br /> methods and materials to be used. Shop Drawing to be <br /> provided X <br /> for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 33. Monument Case and Cover <br /> See Std. Plan. <br /> I <br /> I <br /> Supplemental to Wage Rates 5 <br /> 03/03/2023 Edition, Published February 6, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.