Laserfiche WebLink
Page I 10 <br /> GROUP IAA - Cranes 200 to 300 tons, or 250 ft of boom <br /> (including jib with attachments) ; Tower crane over 175 ft <br /> in height, base to boom <br /> GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom <br /> (including jib with attachments) ; Crane-overhead, bridge <br /> type, 100 tons and over; Tower crane up to 175 ft in height <br /> base to boom; Loaders-overhead, 8 yards and over; Shovels, <br /> excavator, backhoes-6 yards and over with attachments <br /> GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft <br /> of boom (including jib with attachments) ; Crane-overhead, <br /> bridge type, 45 tons thru 99 tons; Derricks on building <br /> work; Excavator, shovel, backhoes over 3 yards and under 6 <br /> yards; Hard tail end dump articulating off-road equipment <br /> 45 yards and over; Loader- overhead 6 yards to, but not <br /> including 8 yards; Mucking machine, mole, tunnel, drill <br /> and/or shield; Quad 9, HD 41, D-10; Remote control operator <br /> on rubber tired earth moving equipment; Rollagon; <br /> Scrapers-self propelled 45 yards and over; Slipform pavers; <br /> Transporters, all truck or track type <br /> 11 <br /> GROUP 2 - Barrier machine (zipper) ; Batch Plant Operaor- <br /> Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with <br /> attachments; Crane-overhead, bridge type-20 tons through 44 <br /> tons; Chipper; Concrete Pump-truck mount with boom <br /> attachment; Crusher; Deck Engineer/Deck Winches (power) ; <br /> Drilling machine; Excavator, shovel, backhoe-3yards and <br /> under; Finishing Machine, Bidwell, Gamaco and similar <br /> equipment; Guardrail punch; Horizontal/directional drill <br /> operator; Loaders-overhead under 6 yards; Loaders-plant <br /> feed; Locomotives-all; Mechanics-all; Mixers-asphalt plant; <br /> Motor patrol graders-finishing; Piledriver (other than <br /> crane mount) ; Roto-mill,roto-grinder; Screedman, spreader, <br /> topside operator-Blaw Knox, Cedar Rapids, Jaeger, <br /> Caterpillar, Barbar Green; Scraper-self propelled, hard11 <br /> tail end dump, articulating off-road equipment-under 45 <br /> yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; <br /> Transfer material service machine-shuttle buggy, blew <br /> knox-roadtec; Truck crane oiler/driver-100 tons and over; <br /> Truck Mount portable conveyor; Yo Yo Pay dozer <br /> GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; <br /> A-frame crane over 10 tons; Drill oilers-auger type, truck <br /> or crane mount; Dozers-D-9 and under; Forklift-3000 lbs. <br /> and over with attachments; Horizontal/directional drill <br /> locator; Outside hoists- (elevators and manlifts) , air <br /> tuggers, strato tower bucket elevators; Hydralifts/boom <br /> trucks over 10 tons; Loader-elevating type, belt; Motor <br /> patrol grader-nonfinishing; Plant oiler- asphalt, crusher; <br /> Pumps-concrete; Roller, plant mix or multi-lift materials; <br /> Saws-concrete; Scrpers-concrete and carry-all; Service <br /> engineer-equipment; Trenching machines; Truck Crane <br /> Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and <br /> under <br /> 10IPage i <br /> WA20230001 Modification 1 <br /> Federal Wage Determinations for Highway Construction <br />