Laserfiche WebLink
Page I 14 <br /> GROUP 7: Backhoe (over 110,000 gw) ; Backhoes & Hoe Ram (3 yds <br /> & over) ; Blade (finish & bluetop) Automatic, CMI, ABC, <br /> Finish Athey & Huber & similar when used as automatic; <br /> Cableway Operators; Concrete Cleaning/Decontamination <br /> machine operator; Cranes (over 45 tons to but not including <br /> 85 tons) , all attachments including clamshell and dragine; <br /> Derricks & Stiffleys (65 tons & over) ; Elevating Belt <br /> (Holland type) ; Heavy equipment robotics operator; Loader <br /> (360 degrees revolving Koehring Scooper or similar) ; <br /> Loaders (overhead & front-end, over 8 yds. to 10 yds. ) ; <br /> Rubber-tired Scrapers (multiple engine with three or more <br /> scrapers) ; Shovels (3 yds. & over) ; Whirleys & Hammerheads, <br /> ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform <br /> Trailers (Goldhofer, Shaurerly andSimilar) ; Ultra High <br /> Pressure Wateriet Cutting Tool System Operator (30,000 <br /> psi) ; Vacuum Blasting Machine Operator <br /> GROUP 8: Cranes (85 tons and over, and all climbing, <br /> overhead,rail and tower) , all attachments including <br /> clamshell, dragline; Loaders (overhead and front-end, 10 <br /> yards and over) ; Helicopter Pilot <br /> 11 <br /> BOOM PAY: (All Cranes, Including Tower) <br /> 180 ft to 250 ft $ .50 over scale <br /> Over 250 ft $ .80 over scale <br /> NOTE: <br /> In computing the length of the boom on Tower Cranes, they <br /> shall be measured from the base of the Tower to the point <br /> of the boom. <br /> HAZMAT: <br /> Anyone working on HAZMAT jobs, working with supplied air <br /> shall receive $1.00 an hour above classification. <br /> ENGI0612-001 06/01/2020 <br /> PIERCE County ' <br /> ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH <br /> GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. <br /> ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. <br /> Zone 1 (0-25 radius miles) : <br /> Rates Fringes <br /> POWER EQUIPMENT OPERATOR <br /> GROUP lA $ 49.50 22.47 <br /> GROUP IAA $ 50.22 22.47 <br /> GROUP lAAA $ 50. 94 22.47 <br /> GROUP 1 $ 48.77 22.47 <br /> GROUP 2 $ 48.15 22.47 <br /> GROUP 3 $ 47. 60 22.47 <br /> GROUP 4 $ 44.55 22.47 <br /> 14IPage r <br /> WA20230001 Modification 1 <br /> Federal Wage Determinations for Highway Construction <br />