My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I 16 <br /> GROUP 3 - Conveyors; Cranes through 19 tons with attachments; <br /> Crane-A-frame over 10 tons; Drill oilers-auger type, truck <br /> or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and <br /> over with attachments; Horizontal/directional drill <br /> locator; Outside Hoists- (elevators and manlifts) , air <br /> tuggers, strato tower bucket elevators; Hydralifts/boom <br /> trucks over 10 tons; Loaders-elevating type, belt; Motor <br /> patrol grader-nonfinishing; Plant oiler- asphalt, crusher; <br /> Pump-Concrete; Roller, plant mix or multi-lfit materials; <br /> Saws-concrete; Scrapers, concrete and carry all; Service <br /> engineers-equipment; Trenching machines; Truck crane <br /> oiler/driver under 100 tons; Tractors, backhoe under 75 hp <br /> GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; <br /> Concrete Finish Machine-laser screed; Cranes A-frame 10 <br /> tons and under; Elevator and manlift (permanent and shaft <br /> type) ; Forklifts-under 3000 lbs. with attachments; <br /> Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and <br /> under; Oil distributors, blower distribution and mulch <br /> seeding operator; Pavement breaker; Posthole <br /> digger-mechanical; Power plant; Pumps-water; Rigger and <br /> Bellman; Roller-other than plant mix; Wheel Tractors, <br /> farmall type; Shotcrete/gunite equipment operator <br /> FOOTNOTE A- Reduced rates may be paid on the following: <br /> 1. Projects involving work on structures such as buildings <br /> and bridges whose total value is less than $1.5 million <br /> excluding mechanical, electrical, and utility portions of <br /> the contract. <br /> 2. Projects of less than $1 million where no building is <br /> involved. Surfacing and paving included, but utilities <br /> excluded. <br /> 3. Marine projects (docks, wharfs, etc. ) less than $150,000. <br /> HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all <br /> craft classifications subject to working inside a federally <br /> designated hazardous perimeter shall be elgible for <br /> compensation in accordance with the following group <br /> schedule relative to the level of hazardous waste as <br /> outlined in the specific hazardous waste project site <br /> safety plan. <br /> H-1 Base wage rate when on a hazardous waste site when not <br /> outfitted with protective clothing, Class ""D"" Suit - Base <br /> wage rate plus $ .50 per hour. <br /> H-2 Class ""C"" Suit - Base wage rate plus $1.00 per hour. <br /> H-3 Class ""B"" Suit - Base wage rate plus $1.50 per hour. <br /> H-4 Class ""A"" Suit - Base wage rate plus $2.00 per hour. <br /> 1 <br /> 16IPage 1 <br /> WA20230001 Modification 1 <br /> Federal Wage Determinations for Highway Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.