My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Page I 19 <br /> ' HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all <br /> craft classifications subject to working inside a federally <br /> designated hazardous perimeter shall be elgible for <br /> compensation in accordance with the following group <br /> ' schedule relative to the level of hazardous waste as <br /> outlined in the specific hazardous waste project site <br /> safety plan. <br /> H-1 Base wage rate when on a hazardous waste site when not <br /> outfitted with protective clothing, Class ""D"" Suit - Base <br /> wage rate plus $ .50 per hour. <br /> H-2 Class ""C"" Suit - Base wage rate plus $1.00 per hour. <br /> H-3 Class ""B"" Suit - Base wage rate plus $1.50 per hour. <br /> H-4 Class ""A"" Suit - Base wage rate plus $2.00 per hour. <br /> ENGI0701-002 01/01/2018 <br /> CLARK, COWLITZ, KLICKKITAT, PACIFIC (SOUTH) , SKAMANIA, AND <br /> WAHKIAKUM COUNTIES <br /> POWER RQUIPMENT OPERATORS: ZONE 1 <br /> Rates Fringes <br /> POWER EQUIPMENT OPERATOR <br /> GROUP 1 $ 41. 65 14.35 <br /> GROUP lA $ 43.73 14.35 <br /> GROUP 1B $ 45.82 14.35 <br /> GROUP 2 $ 39.74 14.35 <br /> GROUP 3 $ 38.59 14.35 <br /> GROUP 4 $ 37.51 14.35 <br /> ' GROUP 5 $ 36.27 14.35 <br /> GROUP 6 $ 33.05 14.35 <br /> Zone Differential (add to Zone 1 rates) : <br /> Zone 2 - $3.00 <br /> Zone 3 - $6.00 <br /> ' For the following metropolitan counties: MULTNOMAH; <br /> CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; <br /> CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS <br /> INDICATED: <br /> All jobs or projects located in Multnomah, Clackamas and <br /> Marion Counties, West of the western boundary of Mt. Hood <br /> National Forest and West of Mile Post 30 on Interstate 84 <br /> and West of Mile Post 30 on State Highway 26 and West of <br /> Mile Post 30 on Highway 22 and all jobs or projects located <br /> in Yamhill County, Washington County and Columbia County <br /> and all jobs or porjects located in Clark & Cowlitz County, <br /> Washington except that portion of Cowlitz County in the Mt. <br /> St. Helens ""Blast Zone"" shall receive Zone I pay for all <br /> classifications. <br /> 19IPage <br /> WA20230001 Modification 1 <br /> Federal Wage Determinations for Highway Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.