My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. <br /> Change Order Effective Date: <br /> I <br /> CONTRACT TIME <br /> Original Contract Duration Working Days / Calendar Days <br /> Date of Notice to Proceed 1 <br /> Cumulative adjustment to duration by prior Change Orders <br /> Adjustment to duration by this Change Order <br /> New Contract Duration (including this Change Order) <br /> As allowed by the Contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The Contract Sum shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, shall <br /> be adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the Contract <br /> for seeking further equitable adjustment of time and compensation, including, but <br /> not limited to, delays, impacts, inefficiencies, overhead, and direct and indirect <br /> costs, and except as otherwise expressly provided herein, the Contractor will be <br /> barred from (a) asserting any claim for further adjustment of time and <br /> compensation arising out of, or relating to, the charges described in this Change <br /> Order or Work described in Exhibit A and (b) asserting an equitable adjustment <br /> of time or price arising earlier than the date of this Change order. <br /> This provision does not apply to requests for equitable of timeor pri <br /> ce <br /> q q adjustmentpce <br /> for which the Contractor timely and properly provided notice of a differing site <br /> condition, protest, dispute, claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after <br /> the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the Contract between Contractor and City to <br /> the extent explicitly provided herein. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.