My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES <br /> 5"MAX p.. 1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE <br /> • END OF THE PROJECT. <br /> DRAINAGE GRATE TRIM <br /> 2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br /> \\\\\\\\\\\V DRAINAGE DEVICES PER THE MANUFACTURES'S <br /> GRATE FRAME ` RECOMMENDATIONS.CATCH BASIN INLET INSERTS <br /> OVERFLOW BYPASS SHALL BE INSTALLED IN CURB INLETS. <br /> SEDIMENT : RI <br /> BELOW INLET GRATE 3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br /> AND DEBRIS ® DEVICE CLEARING AND GRADING ACTIVITY,OR UPON <br /> PLACEMENT OF A NEW CATCH BASIN. <br /> ,<`t : FILTERED WATER <br /> `; °-^ 4. SEDIMENT SHALL BE REMOVED FROM THE UNIT <br /> _ 6 , 6 WHEN IT BECOMES ONE THIRD FULL OR IN <br /> El ACCORDANCE WITH THE MANUFACTURES' <br /> INSTRUCTIONS. <br /> 5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br /> REMOVING THE INLET INSERTS,EMPTYING,AND <br /> RE-INSTALLING IT INTO THE CATCH BASIN.DO NOT <br /> Li WASH SEDIMENT INTO STORM DRAINS WHILE <br /> CLEANING. <br /> 6. SIZE THE BELOW INLET GRATE DEVICE(BIGD)FOR THE <br /> STORM WATER STRUCTURE IT WILL SERVICE. <br /> 7. THE BIGD SHALL HAVE A BUILT-IN HIGH-FLOW RELIEF <br /> SYSTEM(OVERFLOW BYPASS). <br /> SECTION VIEW <br /> 8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br /> THE BIGD WITHOUT SPILLING THE COLLECTED <br /> MATERIAL. <br /> 9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br /> RETRIEVAL SYSTEM STANDARD SPECIFICATION 8-01.3(15). <br /> TYPICAL <br /> DRAINAGE GRATE �' <br /> i <br /> ' ioff> <br /> P. <br /> BELOW INLET GRATE WSDOT STD PLAN 1-40.20-00 ACCEPTABLE SUBSTITUTE IF <br /> DEVICE \''''' OVERFLOW BYPASS MAINTENANCE MEETS NOTES 1-5 <br /> G TYPICAL <br /> CITY OF EVERETT <br /> l'd <br /> El et PUBLIC WORKS DEPARTMENT <br /> Sg nn[RYAN SASS IHEATHEP GRIFFINI`I WILHELM I° 'SH 12/30/2016 <br /> F. ISOMETRIC VIEW STORM DRAIN INLET n. � � <br /> 12. PROTECTION 210 <br /> M N MIN W IIIIII M Ma MIS NM all M M r MI r M N / SIM <br />
The URL can be used to link to this page
Your browser does not support the video tag.