My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Due to a nationwide waiver, BABA requirements do not apply to raw materials (iron ore <br /> 2 and alloys), scrap (recycled steel or iron), and pig iron ore processed, pelletized, and <br /> 3 reduced iron ore. <br /> 4 <br /> I <br /> 5 The following are considered to be steel manufacturing processes: <br /> 6 <br /> 7 1. Production of steel by any of the following processes: <br /> I 8 <br /> 9 a. Open hearth furnace. <br /> 10 <br /> Ill b. Basic oxygen. <br /> 12 <br /> 13 c. Electric furnace. <br /> 14 <br /> I15 d. Direct reduction. <br /> 16 <br /> 17 2. Rolling, heat treating, and any other similar processing. <br /> I 18 <br /> 19 3. Fabrication of the products: <br /> 20 <br /> I <br /> 21 22 a. Spinning wire into cable or strand. <br /> 23 b. Corrugating and rolling into culverts. <br /> I 24 <br /> 25 c. Shop fabrication. <br /> 26 <br /> I 27 A certification of materials origin will be required for any items comprised of, or containing, <br /> 28 steel or iron construction materials prior to such items being incorporated into the <br /> 29 permanent work. The certification shall be on WSDOT Form 350-109EF provided by the <br /> I <br /> 30 Engineer, or such other form the Contractor chooses, provided it contains the same <br /> 31 information as WSDOT Form 350-109EF. <br /> 32 <br /> 33 Manufactured Products <br /> 34 Due to a nationwide waiver, BABA requirements do not apply to manufactured products. <br /> 35 <br /> 36 Construction Material Requirements <br /> I 37 A Contractor provided certification of materials origin will be required before each <br /> 38 progress estimate or payment. The Contractor will not receive payment until the <br /> 39 certification is received by the Engineer. The Contractor shall certify that all construction <br /> I <br /> 40 41 materials installed during the current progress estimate period meets the Build America, <br /> Buy America Act. The certification shall be on WSDOT Form 350-110EF provided by the <br /> 42 Engineer, or such other form the Contractor chooses, provided it contains the same <br /> I 43 information as WSDOT Form 350-110EF. <br /> 44 <br /> 45 1-06.6.RTF <br /> 46 1-06.6 Recycled Materials <br /> I47 (January 4, 2016 APWA GSP) <br /> 48 <br /> 49 Delete this section, including its subsections, and replace it with the following: <br /> I50 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.