My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 272-056) is included in the Proposal package for this purpose as well as instructions <br /> 2 on how to properly fill out the form. <br /> 3 <br /> 4 The Bidder is advised that the items listed below when listed in the Utilization <br /> 5 Certification must have their amounts reduced to the percentages shown and those I <br /> 6 reduced amounts will be the amount applied towards meeting the DBE COA Goal. <br /> 7 <br /> 8 • Force account at 50% <br /> 9 • Regular dealer at 60% <br /> 10 <br /> 11 In the event of arithmetic errors in completing the DBE Utilization Certification, the 111 <br /> 12 amount listed to be applied towards the DBE COA Goal for each DBE shall govern <br /> 13 and the DBE total amount shall be adjusted accordingly. <br /> 14 I 15 Note: The Contracting Agency shall consider as non-responsive and shall <br /> 16 reject any Bid Proposal submitted that does not contain a DBE <br /> 17 Utilization Certification Form that accurately demonstrates how the <br /> 18 Bidder intends to meet the DBE COA Goal. <br /> 19 <br /> 20 Disadvantaged Business Enterprise Written Confirmation Document(s) <br /> 21 The Bidder shall submit an Disadvantaged Business Enterprise (DBE) Written <br /> 22 Confirmation Document (completed and signed by the DBE)for each DBE firm listed <br /> 23 in the Bidder's completed DBE Utilization Certification submitted with the Bid. Failure <br /> 24 to do so will result in the associated participation being disallowed, which may cause I <br /> 25 the Bid to be determined to be nonresponsive resulting in Bid rejection. <br /> 26 <br /> 27 The Confirmation Documents provide confirmation from the DBEs that they are <br /> 111 <br /> 28 participating in the Contract as provided in the Bidder's Commitment. The <br /> 29 Confirmation Documents must be consistent with the Utilization Certification. <br /> 30 <br /> 31 A DBE Written Confirmation Document (WSDOT Form 422-031) is included in the <br /> 32 Proposal package for this purpose. <br /> 33 <br /> 34 The form(s)shall be received as specified in the special provisions for Section 1-02.9 <br /> 35 Delivery of Proposal. <br /> 36 <br /> 37 It is prohibited for the Bidder to require a DBE to submit a Written Confirmation I <br /> 38 Document with any part of the form left blank. Should the Contracting Agency <br /> 39 determine that an incomplete Written Confirmation Document was signed by a DBE, <br /> 40 the validity of the document comes into question. The associated DBE participation <br /> 41 may not receive credit. <br /> 42 <br /> 43 Selection of Successful Bidder/Good Faith Efforts (GFE) <br /> 44 The successful Bidder shall be selected on the basis of having submitted the lowest <br /> 45 responsive Bid, which demonstrates a good faith effort to achieve the DBE COA <br /> 46 Goal. The Contracting Agency, at any time during the selection process, may request <br /> 47 a breakdown of the bid items and amounts that are counted towards the overall <br /> 48 contract goal for any of the DBEs listed on the DBE Utilization Certification. <br /> 49 <br /> 50 Achieving the DBE COA Goal may be accomplished in one of two ways: <br /> 51 <br /> i <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.