My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2 I <br /> 3 DIVISION2.GR2 <br /> 4 Division 2 <br /> 5 Earthwork <br /> 6 <br /> 7 GLF 2-08.DOCX <br /> 8 2-08 STREET CLEANING I <br /> 9 (******) <br /> 10 I <br /> 11 Section 2-08 of the standard specifications is vacant shall be replaced by the following: <br /> 12 <br /> 13 2-08.1 Description <br /> 14 <br /> 15 This work shall consist of sweeping all construction related roads, and cleaning the <br /> 16 pavement and removing debris from the roadway. , <br /> 17 <br /> 18 2-08.2 Vacant <br /> 19 I <br /> 20 2-08.3 Construction Requirements <br /> 21 <br /> 22 The use of water to perform street sweeping work shall be held to a minimum unless I <br /> 23 designated otherwise by the Engineer. The contractor shall provide self-propelled pickup <br /> 24 sweepers and/or vacuum pick up sweepers for pavement cleaning and debris removal <br /> 25 whenever their use is ordered by the Engineer. The type and number of sweepers are <br /> 26 subject to the approval of the Engineer. <br /> 27 <br /> 28 Daily sweeping shall continue on all construction related roads at least once per day until <br /> 29 said surface is covered with new HMA. In the event the Contractor sweeper will not be <br /> 30 able to work daily on ground surfaces, the City Forces will provide services, and the <br /> 31 Contractor will be billed for each hour of operation. <br /> 32 <br /> 33 The following work shall not be paid by "Street Cleaning", it shall be included in the bid <br /> 34 item "Planing Bituminous Pavement" (2" Deep), per square yard: <br /> 35II <br /> 36 1. Sweepers following the grinding work. <br /> 37 2. Debris left in the road or on the side of the road from Planing Bituminous <br /> 38 Pavement. <br /> 39 <br /> 40 The Contractor shall plan the operation to minimize the need for street cleaning. <br /> 41 <br /> 42 2-08.4 Measurement <br /> 43 <br /> 44 Street cleaning will be measured by the hour for the actual time consumed in sweeping, I <br /> 45 pavement cleaning, and debris removal. No allowance will be made for time consumed <br /> 46 in making repairs to the equipment or for moving the equipment to or from the site on <br /> 47 which the street cleaning is ordered. No separate payment will be made for water I <br /> 48 required for the normal operation of the pickup sweepers. <br /> 49 <br /> i <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.