My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10121 EVERGREEN WAY KID STRONG 2023-05-19
>
Address Records
>
EVERGREEN WAY
>
10121
>
KID STRONG
>
10121 EVERGREEN WAY KID STRONG 2023-05-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:26:20 AM
Creation date
5/19/2023 10:25:34 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10121
Tenant Name
KID STRONG
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. <br /> Lighting, Motor and Electrical Requirements List, pg 10 of 10 <br /> 2018 WSEC Requirements for Commercial Buil• .s including Group R2,R3&R4 over 3 stories&all R1-- -• inistered by©2023 NEEA,All rights reserved <br /> The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> C408.1.2 Commissioning Include general summary of Cx plan per <br /> C408.1.2.1 requirements in C408.1.2 including:1)Narrative description <br /> C408.1.4 construction of activities;2)Responsibilities of the Cx <br /> C103.6.3 documents team;3)Schedule of activities including <br /> verification of project close out <br /> documentation per CI03.6;4)Conflict of <br /> interest plan(if required) <br /> C408.1.2 Commissioning Include in general summary that a Cx project <br /> C408.1.4 requirements in report and Compliance Checklist(Figure <br /> C103.6.3 construction C408.1.4.1)shall be completed by the <br /> documents Certified Cx Professional and provided to the <br /> owner prior to the final electrical inspection <br /> C408.4.1 Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> including interfacing between new and <br /> existing-to-remain systems <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> C103.6.3 Project close out Indicate in plans that project close out <br /> documentation documentation is required including WSEC <br /> requirements lighting compliance reports that document all <br /> interior and exterior lighting area and/or <br /> surface types,lighting power allowances and <br /> installed densities <br /> If"no"is selected for any question,provide explanation. <br /> Page 10/10 -.4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.