My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 00 72 00 GENERAL CONDITIONS <br /> I8.3. Quality 27 <br /> 8.4. Material and Equipment Specified by Name 27 <br /> I 8.5. Requests for Substitution 27 <br /> 8.6. Demonstration of Compliance with Contract Requirements 28 <br /> 8.6.1. Inspection 28 <br /> I 8.6.2. Samples of Materials 28 <br /> 8.6.3. Certification 28 <br /> 8.6.4. Inspection at Point of Manufacturing 28 <br /> I 8.6.5. Testing and Commissioning of Completed Work 29 <br /> 8.6.6. Storage of Materials and Equipment 29 <br /> 8.6.7. Manufacturer's Directions 29 <br /> I 8.7. Defective Work 29 <br /> 8.7.1. Correction of Defective Work 29 <br /> 8.7.2. Retention of Defective Work 29 <br /> I8.8. Materials and Equipment Furnished by Owner 30 <br /> 8.9. Guarantee 30 <br /> 8.10. Correction Period 30 <br /> 1 9. MEASUREMENT AND PAYMENT 31 <br /> 9.1. Payments to Contractor 31 <br /> I 9.1.1. Schedule of Values 31 <br /> 9.1.2. Progress Payments 31 <br /> 9.1.2.1 Payment Request Procedures- 31 <br /> I 9.1.2.2 Review Procedures: 32 <br /> 9.1.2.3 Retained Percentage 32 <br /> 9.1.2.4 Withholding 32 <br /> I 9.1.3. Final Payment 33 <br /> 9.2. Payment for Changes 34 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 34 <br /> I9.2.1.1. Increased Quantities 34 <br /> 9.2.1.2. Decreased Quantities 34 <br /> 9.2.1.3. Limitations 34 <br /> I9.2.2. Changes in Work Not Covered By Unit Prices 34 <br /> 9.2.3. Deleted Work 34 <br /> I 9.3. Charges to Contractor 35 <br /> 9.4. Compensation to Owner for Time Extension 36 <br /> 9.5. Adjustment of Contract Sum 36 <br /> I 9.5.1 Calculation 36 <br /> 9.5.2 Limitations 36 <br /> 9.5.3 Unabsorbed and Extended Overhead 37 <br /> I 9.6. Force Account 37 <br /> 9.6.1 Labor 38 <br /> 9.6.2. Materials. 38 <br /> I 9.6.3. Equipment 39 <br /> 9.6.4. For Services. 39 <br /> 9.6.5. For Mobilization. 39 <br /> I City of Everett 00 72 00 ill February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.