My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> Item 2 - DRAWING S2, APPROVED FABRICTOR SPECIAL INPSECTION <br /> EXEMPTIONS, First sentence. <br /> Replace "City of Port Orchard" with "City of Everett". I <br /> ANSWERS TO QUESTIONS SUBMITTTED FOR CLARIFICATION <br /> Q1 - Is there any existing drawings that show the rebar and wall thickness for <br /> diversion structure 2- where we are installing 42" core? - A portion of the <br /> as-builts from the COE Phase A project have been included with this <br /> Addendum 2. <br /> Q2 - Who pays for testing lab services on compaction testing? — Special <br /> inspections will be contracted to a third party and paid for by the City. <br /> Q3 - What is the existing depth of the asphalt and what is the new depth of asphalt <br /> going back? — The City does not have records of the existing asphalt <br /> depth. It's assumed the existing asphalt depth is around 4"to 6"from <br /> previous work at the plant. However, this is purely an assumption. For <br /> new asphalt, there is a paving detail on Sheet C6. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> Addendum 2 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.