My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> 4.4.3. Payment for Labor and Materials <br /> The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor including <br /> Worker's Compensation premiums, State Unemployment and Federal Social Security payments and other <br /> wage and salary deductions required by law. The Contractor also shall pay and cause its Subcontractors <br /> to pay any and all accounts for services,Equipment, and materials used by him and its Subcontractors <br /> during the performance of Work under this Contract. The Contractor shall pay such accounts as they <br /> become due and payable. If requested by the Owner,the Contractor shall promptly furnish proof of <br /> payment of such accounts to the Owner. <br /> 4.4.4. Attention to Work <br /> The Contractor,acting through its representative, shall give personal attention to and shall manage the <br /> Work so that it shall be prosecuted faithfully and completed under the Project schedule. When its <br /> representative is not personally present at the Project Site, its designated alternate shall be available and <br /> shall have the authority to act in matters relating to this Contract. <br /> 4.4.5. Safety <br /> The Contractor alone shall be responsible for safety on the job Site,including,but not limited to,the <br /> safety of its and its Subcontractor's employees. The Contractor shall maintain the Project Site and <br /> perform the Work in a manner which meets the Owner's responsibility under statutory and common law <br /> for the provision of a safe place to work. <br /> 4.4.6. Threats,Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees,its Subcontractors, its Subcontractors' employees,or any other <br /> agents to threaten bodily injury or property damage,to intimidate or attempt to intimidate any person, or <br /> to assault or physically harass any person. Forbidden conduct includes,but is not limited to,threatening, <br /> appearing,or actually doing any of the following: pushing,shoving, striking,physically blocking a person <br /> or a person's vehicle,vandalism,malicious mischief,or any other act that a reasonable person would <br /> understand be intended to intimidate,cause personal injury,or cause property damage. Contractor shall <br /> remove from the job site any person reasonably under its control or direction who the Contractor or <br /> Owner reasonably believes violated this section. The lack of a request from the Owner or Owner's <br /> Representative to the Contractor to remove someone from the job Site does not relieve the Contractor <br /> from its obligation to remove someone. <br /> 4.4.7. Weapons Forbidden <br /> Contractor shall not allow its employees,its Subcontractors,its Subcontractors' employees,or any other <br /> agents or representatives to carry or possess,openly or concealed,explosives or weapons on the job Site, <br /> except: (a) such explosives are as reasonably required for performance of the Work, such as those <br /> necessary for blasting or demolition work called for by the Contract Documents or(b)commissioned law <br /> enforcement officers or security personnel under authority of their commission.A weapon is any object, <br /> instrument or chemical which is(1) designed in such a manner to inflict harm or injury to another person; <br /> or(2)any item used in a manner threatening harm or injury to another person.Weapons include,but are <br /> not limited to, firearms, dangerous knives,dangerous chemicals,tear gas,martial arts weapons, <br /> blackjacks or other weapons. Further,weapons should include those delineated in EMC Chapter 10.78. b. <br /> ' Possession of mace,pepper spray or the like for defensive purposes is not a violation of this policy. <br /> Contractor shall remove from the job Site any person reasonably under its control or direction who the <br /> Contractor or Owner reasonably believes violated this section. The lack of a request from the Owner or <br /> Owner's Representative to the Contractor to remove someone from the job Site does not relieve the <br /> Contractor from its obligation to remove someone. <br /> 4.4.8. Safety Standards <br /> The Contractor shall comply with Section 107 of the Contract Work Hours and Safety Standards Act(40 <br /> U.S.C. 327-330)as supplemented by Department of Labor Regulations(29 CFR,Part 5). Under this <br /> City of Everett 00 72 00-13 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.