My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 00 72 00 GENERAL CONDITIONS <br /> If requested by the Contractor,the Owner will arrange meetings with other contractors performing work 'I <br /> on behalf of the Owner to plan coordination of construction activities. The Contractor shalt inform itself <br /> of the planned activities of other contractors and will coordinate its work with the other contractors. <br /> Contractor shall notify the Owner of problems,interference or any difficulty with other contractors or <br /> workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> Owner to mitigate or avoid increased costs, time of performance,damages or injury. Contractor's failure <br /> to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br /> Claims relating to,arising out of,or caused by,any alleged interference,difficulty or problem with <br /> another contractor or worker engaged by the Owner. <br /> 5. PROGRESS AND COMPLETION <br /> 5.1. NOTICE TO PROCEED I <br /> Following execution of the Contract by the Owner,the Owner or Owner's Representative will give the <br /> Contractor a written Notice to Proceed. Notwithstanding other provisions of the Contract,the Contractor <br /> shall not be obligated to perform Work,and the Owner will not be obligated to accept or pay for Work <br /> performed by the Contractor or be liable for any Delays,prior to delivery of the Notice to Proceed. The <br /> Owner's knowledge of Work being performed prior to delivery of the Notice to Proceed will not obligate <br /> the Owner to accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum and Contract Time arising out of,or related to,work it performs prior to <br /> receipt of the Notice to Proceed. The Owner may issue partial Notices to Proceed. <br /> 5.2. CONTRACT TIME I <br /> 5.2.1. General <br /> TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the 1 <br /> Project within the contractually specified time may affect other Projects and Owner activities. Contract <br /> Time starts upon the later of the issuance of the Notice to Proceed or a date specified in the Notice to <br /> Proceed. The Contractor shall promptly start the Work as soon as possible after the date of the Notice to <br /> Proceed and shall prosecute the Work so that the various portions of the Project shall be completed in <br /> accordance with the Contract Time period. Contractor shall perform its work at such times and in such <br /> ways that the Work is not damaged by weather such as wind,rain,or snow. Contractor shall correct or <br /> repair at its sole expense any Work damaged by weather, irrespective of whether such damage is covered <br /> by insurance. No portions of the Work where acceptable quality will be affected shall be constructed <br /> while unfavorable conditions exist. By bidding on the Project and executing a Contract to perform the <br /> Work,Contractor agrees the contractually required completion dates are feasible,reasonable,and <br /> achievable for the Contract Sum. Contractor represents that it has considered all factors relevant to its <br /> price and achieving the Completion Dates,including,but not limited to,weather, Site access,labor <br /> conditions and the availability of materials,supplies and Equipment. Compliance with ARTICLE 10. <br /> NOTICE TO OWNER,ARTICLE 12. CONTRACT CLAIMS,and 5.2.2. Construction Schedule <br /> are conditions precedent to a request for,consideration of,and grant of,any extension of Contract Time. <br /> Failure to request a time extension in the manner and in the time required by this section,and the <br /> Specifications referred to herein,constitutes a waiver by the Contractor of any and all entitlement to an <br /> extension of time and any adjustment of Contract Sum arising out,or related to,such Delay. <br /> 5.2.2. Construction Schedule <br /> 5.2.2.1 General <br /> Contractor shall submit,update and maintain schedules as required by the Contract Documents. <br /> The Contractor shall provide sufficient material,equipment,and labor to meet the interim milestones, <br /> Substantial Completion, Physical Completion and Completion Dates provided by the Contract <br /> Documents. The Owner allocates its resources to a Contract based on the total time allowed in the <br /> City of Everett 00 72 00-16 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.