My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Section 00 72 00 GENERAL CONDITIONS <br /> begins using the Project or portion of the Project for its intended purpose. Division of responsibilities <br /> between Owner and Contractor,beginning of warranties, and any other issues relating to Substantial <br /> Completion shall be as specified in 5.7. SUBSTANTIAL COMPLETION. <br /> 5.7. SUBSTANTIAL COMPLETION <br /> When the Contractor considers the Work to be Substantially Complete and ready for its intended use,it <br /> shall give Notice to the Owner's Representative. The Notice shall include an itemized list of remaining <br /> incomplete Work. If the Owner's Representative determine the Work is not substantially complete,the <br /> Contractor will be notified in writing,identifying the reasons for such a determination. If the Owner's <br /> Representatives find the Work substantially complete,he or she will meet with the Contractor to(1) <br /> prepare a Punch List of incomplete items of Work; (2)define the division of responsibility between <br /> Owner and Contractor with respect to security,operation,maintenance,heat,utilities, insurance,and <br /> warranties;and(3) describe any other issues related to acceptance of the substantially completed Work. <br /> If the Owner's Representative is not an employee of the Owner,the Owner's Representative will write to <br /> the Owner upon reaching agreement with the Contractor,certifying that the Work is substantially <br /> complete,listing the items of incomplete Work, stating the date for completion of incomplete Work, <br /> defining the division of responsibilities,and setting forth any other terms related to acceptance. In such <br /> event, the Owner will review the Owner's Representative's certification that the Work is substantially <br /> complete. If the Owner concurs,the Owner will notify the Contractor in writing that the Work is <br /> accepted as substantially complete. Except for any portion(s) of Work specified for early completion or <br /> required by the Owner for early possession, Substantial Completion will not occur for any Work until the <br /> entire Project is ready for possession and use. The acceptance notice will include a Punch List of <br /> incomplete Work items and corrective Work, set the date for their completion and repair,describe the I <br /> division of responsibility between the Owner and Contractor,and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing, indicating acceptance of all <br /> of its terms and provisions. <br /> Subsequent to the Substantial Completion date, the Owner may exclude the Contractor from the Work <br /> during such periods when construction activities might interfere with the intended operation of the <br /> Project. The Owner,however, shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. <br /> 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project,including,but not limited to,record drawings,as-builts,required reports 1 <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection,determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> Owner's Representative finds materials,Equipment,or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner 111 <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety, and the Contractor agrees to perform the Work as changed.Among <br /> others,these changes and alterations may include: <br /> City of Everett 00 72 00-22 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.