Laserfiche WebLink
r <br /> I <br /> am PUBLIC WORKS <br /> ion <br /> EVERETT <br /> WASHINGTON <br /> ADDENDUM NO. 3 TO <br /> WPCF TRI BAR SCREEN UPGRADES <br /> WO. # UP 3770 <br /> MARCH 8, 2023 <br /> NOTICE TO PLANHOLDERS <br /> Addendum No. 3 contains the following revisions, additions, deletions and clarifications <br /> and is hereby made a part of the contract documents for the above-named Project and <br /> shall be considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 3 in the space provided on page <br /> 00 4113-3 in the Bid Form. Failure to comply with this requirement may render the Bid <br /> non-responsive and may cause its rejection. <br /> This Addendum 3 consists of 2 pages, including all revisions, attachments and details. <br /> The Bid date for receipt of Bids has NOT been changed by this <br /> Addendum. <br /> I <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 1 - SPECIFICATION 00 68 00, APPRENTICESHIP UTILIZATION AND <br /> REPORTING <br /> This section is removed in its entirety. <br /> ANSWERS TO QUESTIONS SUBMITTTED FOR CLARIFICATION <br /> Q1 - Seven (7) feet of head is needed in Diversion Structure 2 for bypass pumping, <br /> is this achievable? - WPCF staff can raise the AC pond levels to <br /> Addendum 3 Pagel <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425) 257-8882 <br />