McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a Contract Claim is <br /> made or in the absence of actual cost,the rates established by the AGC/WSDOT Equipment <br /> Rental Agreement that was in effect when the work was performed. In no case shall the <br /> amounts sought or paid for each piece of equipment exceed the rates established by the <br /> Equipment Rental Agreement even if the actual cost for such equipment is higher. The <br /> Owner may audit the Contractor's cost records to determine actual equipment cost. The <br /> following information shall be provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", Tractor <br /> Crawler ROPS&Dozer Included Diesel) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job Overhead. <br /> v. Overhead(general and administrative). <br /> vi. Subcontractor's contract claims (in the same level of detail as specified herein is required <br /> for all Subcontractor's contract claims);and <br /> vii. Other categories as specified by the Contractor or the Owner. <br /> ' 10. A notarized statement shall be submitted to the Owner's Representative containing the following <br /> language: <br /> rUnder the penalty of law for perjury or falsification,the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> ' hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or <br /> Contract Time, if any,made herein for Work on this Contract is a true and complete <br /> statement of the factual basis of the Contract Claim and all actual costs incurred and time <br /> sought,and is fully documented and supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> ' My Commission Expires: <br /> 12.3 FALSE OR OMITTED INFORMATION <br /> The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br /> the exercise of reasonable care should know,is false,or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br /> and expenses incurred in investigating any such Contract Claim. <br /> City of Everett 00 72 00-45 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br />