My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> by strikes,work slowdowns,job actions and labor unrest of any kind. Contractor shall not be entitled to <br /> any increase in Contract Sum or Contract Time due to a Delay it caused. <br /> 12.4.3.3 Delays Concurrently Caused by Contractor and Owner <br /> If the Owner and the Contractor cause a Delay concurrently,neither the Owner nor the Contractor shall be <br /> liable to the other except as provided herein. <br /> 12.4.3.3.1 Adjustment of Contract Sum <br /> The Contractor shall not be entitled to any adjustment in Contract Sum for Delays concurrently <br /> caused by the Owner and the Contractor. <br /> 12.4.3.3.2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for the Owner caused portion of any <br /> ' Delay concurrently caused by the Owner and Contractor to the extent the Owner caused the Delay to <br /> extend longer than if the Contractor had solely caused the Delay. <br /> 12.4.3.4 Third Party Caused Delays and Force Majeure <br /> For the purposes of this section 12.4.3.4, a"Force Majeure Event"is defined as earthquake,flood, <br /> pandemic(and governmental laws,regulations,requirements,and orders resulting therefrom),natural <br /> disasters,acts of war or acts of terrorism. Pandemic in the preceding sentence includes without <br /> ' limitation the COVID-19/novel coronavirus(SARS-CoV-2)pandemic,which is the subject of the <br /> Governor's proclamation dated February 29,2020,and subsequent proclamations. <br /> For the purposes of this section 12.4.3.4, a"Third Party" is defined as a third party for whom neither <br /> ' the Contractor nor the City is responsible. <br /> 12.4.3.4.1 Adjustment of Contract Sum <br /> The Owner and the Contractor shall not be responsible to compensate each other financially for <br /> any Delay to the extent caused by a Third Party or a Force Majeure Event. A Delay caused by a <br /> utility's failure to provide service or relocate its lines(despite a timely request for such service or <br /> ' relocation)is an example of this kind of Delay for which neither the Contractor nor the Owner is <br /> financially responsible to the other. Mislocated utility lines or utility lines not located are another <br /> example of a Delay for which neither the Contractor nor the Owner is responsible to the other. <br /> However,the Contractor's failure to request a utility locate or relocation in a timely way is not, <br /> and any resulting Delay would be the responsibility of the Contractor. Because the Contractor is <br /> responsible for ordering materials and.Equipment,Contractor shall not be entitled to an <br /> adjustment of Contract Time or Contract Sum due to Delays caused by the lack of materials or <br /> Equipment. A strike,job action, slowdown,work to rule,or other job action or labor dispute or <br /> problem is not a Delay caused by a Third Party for the purposes of section 12.4.3 Delays. <br /> 12.4.3.4.2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for Delays to the extent caused <br /> by a Third Party or Force Majeure Event. Extension of Contract Time shall be determined <br /> pursuant to 5.2.2.2 Extensions of Contract Time. <br /> ' 12.4.3.5 Extended or Unabsorbed Overhead <br /> 12.4.3.5.1 General <br /> To present a request for additional compensation for Extended or Unabsorbed Overhead, the <br /> Contractor has the burden of keeping and maintaining accurate documentation to support any such <br /> claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br /> Eichleay calculation,Contractor waives and releases any claim for Unabsorbed or Extended <br /> Overhead. In presenting any claim under this section of the Contract,the Contractor agrees to provide <br /> to the Owner any and all financial data needed by the Owner, or its representative,to review, <br /> City of Everett 00 72 00 47 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br />
The URL can be used to link to this page
Your browser does not support the video tag.