Laserfiche WebLink
I <br /> TABLE OF CONTENTS <br /> 01 33 00 Submittals <br /> 01 35 29 Health and Safety <br /> 01 35 53 Security Procedures I <br /> 01 50 00 Temporary Facilities and Controls <br /> 01 60 00 Materials and Equipment I <br /> 01 74 23 Final Cleaning <br /> 01 77 00 Closeout Procedures <br /> 01 79 39 Record Drawings <br /> 01 91 10 Facility Startup and Testing <br /> — <br /> DIVISION 02 DEMOLITION <br /> 02 41 00 Demolition, Cutting, and Patching <br /> DIVISION 03 — CONCRETE <br /> 03 60 00 Grout <br /> DIVISION 05— METALS <br /> 05 50 00 Metal Fabrications I <br /> DIVISION 13 — SPECIAL CONSTRUCTION <br /> 13 53 00 Seismic Restraint Requirements for Non-Structural Components I <br /> DIVISION 31 — EARTHWORK <br /> 31 23 19 Groundwater Control I <br /> 31 23 33 Trenching, Backfilling and Compacting for Utilities <br /> 31 25 14 Soil Erosion and Sediment Control <br /> 31 41 00 Excavation Support Systems <br /> DIVISION 32 — EXTERIOR IMPROVEMENTS <br /> 32 12 16 Hot Mix Asphalt (HMA) Paving <br /> DIVISION 33— UTILITIES <br /> 33 05 01 Pipe and Fittings <br /> 33 05 09 Piping Specials <br /> 33 05 16 Precast Vault <br /> DIVISION 35—WATERWAY AND MARINE CONSTRUCTION <br /> 35 22 00 Hydraulic Gates <br /> I <br /> City of Everett TOC-ii February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />