Laserfiche WebLink
I <br /> Section 00 21 13 INSTRUCTIONS TO BIDDERS <br /> i. The Bid Form does not constitute a definite and unqualified offer to meet the material <br /> terms of the Bid invitation; or <br /> j. More than one proposal is submitted for the same project from a Bidder under the <br /> same or different names. <br /> 2. A Proposal may be considered irregular and may be rejected if: <br /> a. If the Bid Form includes unit prices, the Bidder's Bid Form does not include a unit <br /> price for every Bid item; <br /> b. If the Bid Form includes unit prices, any of the Bidder's unit prices are excessively <br /> unbalanced (either above or below the amount of a reasonable Bid)to the potential <br /> detriment of the City, as determined by the City; <br /> c. Receipt of Addenda is not acknowledged; <br /> d. A member of a joint venture or partnership and the joint venture or partnership <br /> submit Proposals for the same project (in such an instance, both Bids may be <br /> rejected); or <br /> e. If Bid Form entries are not made in ink. <br /> 1-02.14 Disqualification of Bidders <br /> A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br /> responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br /> The City will verify that the Bidder meets the mandatory bidder responsibility criteria in RCW <br /> 39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br /> documentation as needed from the Bidder and third parties concerning the Bidder's compliance <br /> with the mandatory bidder responsibility criteria. <br /> If the City determines the Bidder does not meet the mandatory bidder responsibility criteria in <br /> RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall notify the Bidder in <br /> writing, with the reasons for its determination. If the Bidder disagrees with this determination, it <br /> may appeal the determination within two business days of the City's determination by <br /> presenting its appeal and any additional information to the City. The City will consider the <br /> appeal and any additional information before issuing its final determination. If the final <br /> determination affirms that the Bidder is not responsible, the City will not execute a contract with <br /> any other Bidder until at least two business days after the Bidder determined to be not <br /> responsible has received the City's final determination. <br /> If the Contract Documents contain supplemental responsibility criteria, then a Bidder will be <br /> deemed not responsible if the Bidder does not meet those criteria, all as set forth in SECTION <br /> 00 2213, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS. <br /> 1-02.15 Pre-Award Information <br /> Before awarding any contract, the City may require one or more of these items or actions of the <br /> apparent lowest responsible Bidder: <br /> 1. A complete statement of the origin, composition, and manufacture of any or all materials <br /> to be used, <br /> 2. Samples of these materials for quality and fitness tests, <br /> City of Everett 00 21 13-9 February 2023 <br /> WPCF TF1 Bar Screen Upgrades <br /> UP3770 <br /> I <br />