My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 00 41 13 BID FORM <br /> I1.03 ACCEPTANCE <br /> I A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid <br /> closing date. <br /> IB. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> I 2. Furnish the required 100% payment and 100% performance bonds within <br /> 14 calendar days of receipt of Notice of Award in the form described in <br /> Contract Documents. Commence Work within seven calendar days after <br /> receipt of Notice to Proceed. <br /> IC. If this Bid is accepted within the indicated time, and we fail to commence the <br /> Work or we fail to provide the required bonds,the Bid security shall be forfeited <br /> I as damages to the Owner by reason of our failure, limited in amount to the lesser <br /> of the face value of the Bid security or the difference between this Bid and the <br /> Bid upon which Contract is signed. <br /> I D. In the event our Bid is not accepted within the time stated above, the required Bid <br /> security will be returned to the undersigned, according to the provisions of the <br /> Instructions to Bidders, unless a mutually satisfactory arrangement is made for its <br /> Iretention and validity for an extended period of time. <br /> 1.04 CONTRACT TIME <br /> IA. If this Bid is accepted, we will: <br /> 1. Begin work immediately after receiving Owner's letter of Notice to <br /> I Proceed and to reach Substantial Completion within the dates required <br /> under the Contract Documents. <br /> 2. Agree to pay liquidated damages to the City as stated in the Contract in <br /> Ithe event the project is not completed on or before required time periods. <br /> 3. Contract with the Owner using the Contract form provided herewith, on <br /> the terms and conditions contained herein, to do everything necessary to <br /> Icomplete the construction of the project in the allotted time. <br /> 1.05 ADDENDA <br /> IA. Following Addenda have been received, and the modifications to the Bid <br /> Documents noted below have been considered and all costs are included in the <br /> Bid. <br /> IAddendum No / , dated .'fig <br /> Addendum No '? , dated .:.,/.-: /.: . <br /> IAddendum No , dated . 1 ) ... <br /> Addendum No , dated <br /> I <br /> ICity of Everett 00 41 13-3 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.