Laserfiche WebLink
SECTION 00 43 36 <br /> PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> 18.106)and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> installation and rebar installation, Bidder MUST either identify itself or Subcontractors in <br /> the chart below. If Bidder believes such work is not part of the Work, Bidder shall write <br /> "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work identified, <br /> unless Subcontractors vary with bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation and air conditioning, plumbing, electrical work, structural <br /> ' steel installation and rebar installation, Bidder fails: (1) to submit as part of the <br /> Bid the names of such Subcontractors; (2)to name itself to perform such Work; <br /> or(3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation subcontractors <br /> applies only to proposed heating, ventilation and air conditioning, plumbing, electrical, <br /> structural steel installation and rebar installation subcontractors who will contract directly <br /> with the general contractor submitting the Bid to the City. <br /> ' 5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart <br /> below must be submitted with the bid proposal or within one hour of the published bid <br /> submittal time. <br /> ' 6. The structural steel installation and rebar installation portions of the chart below must be <br /> submitted with the bid proposal or within forty-eight hours of the published bid submittal <br /> time. <br /> Type/Scope of Work Name and Address of Subcontractor/or <br /> Bidder <br /> HEATING <br /> Subcontractor, bidder or"no work" MUST be stated , sn r-r� <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be stated 4/i'S ui.`tv'X <br /> PLUMBING (as described in RCW Chap. 18.106) 5 . %4,'RJ 7 '% 94 c- <br /> Subcontractor, bidder or"no work" MUST be stated 1.51 <:, . '‘",''" <br /> ELECTRICAL (as described in RCW Chap. 19.28) r9.4111. /L/e1, AZT <br /> ' Subcontractor, bidder or"no work" MUST be stated A)et /-��v� .;ii. c-2 4,` Ar✓t7 o3.2 <br /> STRUCTURAL STEEL INSTALLATION r; �"''' 0/'''- <br /> Subcontractor, bidder or"no work" MUST be stated ./." ✓ e'4,Y.4'% d6, Z.vv'i= /dz c-1//'"il;:'!S ' <br /> REBAR INSTALLATION es4;vr�s" <br /> Subcontractor, bidder or"no work" MUST be stated / "'-9/ ` «dz" ,:fi . to ./..fe J #2 <br /> END OF SECTION 00 43 36 <br /> City of Everett 00 43 36-1 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />