' SECTION 00 52 13 <br /> CONTRACT FORM <br /> ' CONTRACT <br /> THIS CONTRACT is made and entered into this today of P\PR , , by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State of Washington (the"City") and 1)) C L'JRi_ A -50 500S Tr-se- , (the <br /> "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br /> workmanlike manner the work, improvements, and/or appurtenances in accordance with the <br /> Specifications and Drawings and all other Contract Documents entitled: <br /> "W P CF IVA OAR SCR{Lt- " (the "Project"). <br /> ' v PbP,INd5 <br /> 1. Contract Documents. The "Contract Documents" are defined in the General <br /> Conditions. he Contract Documents are part of this Contract and are hereby <br /> incorporated by reference. Terms that are capitalized in a Contract Document but not <br /> defined in that Contract Document shall have the meaning defined to them in the other <br /> Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within Three <br /> Hundred Thirty Five (335) calendar days after the effective date of the Notice to <br /> Proceed. Physical Completion shall be within Thirty (30) calendar days after the actual <br /> date of issuance of Substantial Completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to <br /> ' additional expense in the event that the Contractor does not complete the Work in all <br /> respects and have it ready for use by the Substantial and Physical Completion dates <br /> stated above. Because it is difficult to accurately compute the amount of such costs and <br /> damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages for each and every calendar day (or working day, if Contract Time is described <br /> in working days) in the amounts set forth in this Section. For failure to achieve <br /> Substantial Completion by the Substantial Completion date stated above, the Contractor <br /> shall pay liquidated damages to the City computed at the daily rate of fifteen percent <br /> (15%)of the Contract Sum divided by the number of days of Contract Time stated <br /> above. Once Substantial Completion is achieved, for failure to achieve Physical <br /> ' Completion by the Physical Completion Date stated above, the Contractor shall pay <br /> liquidated damages at the daily rate of ten percent (10%) of the liquidated damages rate <br /> applicable to delays to Substantial Completion. <br /> 4. Contract Sum. The Contract Sum of this Contract is: <br /> + WA Sales Tax (as applicable) a05) 0(.2), H9 <br /> Contract Sum p.75 -7 I a- ij <br /> This is based on the proposal/bid submitted by Contractor dated <br /> City of Everett 00 52 13-1 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br />