Laserfiche WebLink
Section 0D 52 13 CONTRACT FORM <br /> Contractor expressly acknowledges that this waiver of immunity under Title 51 RCW was <br /> the subject of mutual negotiation and was specifically entered into pursuant to the <br /> provisions of RCW 4.24.115. <br /> 11. Repair of Damage. The Contractor agrees to repair and replace all property of the City <br /> and all property of others damaged by it, its employees, subcontractors, suppliers and <br /> agents. I <br /> 12. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under <br /> this contract is to be done at the Contractor's risk and that: (1) prior to submitting its <br /> proposal or bid, it became familiar with the conditions of excavation, subsurface, backfill, <br /> materials, climatic conditions, location, traffic, and other contingencies that may affect <br /> the work and has made its bid or proposal accordingly and (2)that it assumes the <br /> responsibility and risk of all loss or damage to materials or work that may arise from any <br /> cause whatsoever prior to completion. <br /> 13. Headings for Convenience Only. The headings in this document are for convenience I <br /> only and shall not be used or considered to interpret or construe this document. <br /> 14. Effective Date. This Contract is effective as of the date of the last person to sign it, and <br /> may be executed in multiple counterparts, each of which shall be deemed an original. <br /> I <br /> I <br /> 1 <br /> I <br /> City of Everett 00 52 13-4 February 2023 <br /> WPCF TF1 Bar Screen Upgrades <br /> UP3770 <br />