Laserfiche WebLink
11 of 34 <br /> Thursday, January 28, 2021 <br /> e <br /> FOUNDATION SPECIAIJST <br /> . <br /> Si i <br /> .. * i <br /> .,w..s .t :. . <br /> l!iii <br /> 1 -7 <br /> Y § <br /> t* y■ <br /> E m <br /> X <br /> Front of home, Pile 1 will be installed here. Crew North side of home, Piles 2-9 will be installed here with <br /> will install 6" Steel Channel on interior foundation 6" Steel Channel segment. <br /> wall. <br /> Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building <br /> geometry, tributary areas, and loading were determined through examination of these photographs and <br /> industry knowledge of standard construction practices. - L120 <br /> ii ejilii:: lit'v ' ' <br /> • i�� - v111 <br /> III. <br /> Back of home, Piles 10-13 will be installed here with Crew will install 6x6 Post Bases with Pads here in crawl <br /> 6" Steel Channel. space. Crew will remove false wall to install adjustable <br /> post bases with pads. <br />